Loading…
Loading…
1,423 results • Recent activity
TTPS Mech II BM Unit I II III Replacement of existing AC scanner cooling air fans with new direct driven type AC scanner air fans in Unit I II III Boiler
TTPS Mech II BM Unit II Dismantling of existing hydro motor valve and erection of new Burner steam trip valves in AB CD and EF elevations of Unit II Boiler during the year 2025 2026 overhaul
TTPS Mech II BM Unit III Painting of Instrument air line service air line around burner area and water washing line from 4 Mtr to 50 Mtr in Unit III Boiler
SUPPLY ERECTION AND COMMISSIONING OF DISCHARGE PIPE WITH MAN HOLE TAPPING FOR CONDENSER INLET WEST SIDE OD 1650 MM ID 1600 MM LENGTH 5000 MM THICK 25 MM OF UNIT V
PROCUREMENT OF 3 CORE X 300 Sq. mm., 11KV GRADE, ALUMINIUM, ARMOURED, XLPE, HT POWER CABLE
Procurement of Various sizes of M S Plates and Iron and Steel for Unit I II and III Bottom Ash Hopper Ash disposal system