Loading…
Loading…
1,423 results • Recent activity
ICHP- Cleaning of coal dust accumulated in the cables, cable tray and cable tray structure etc., routed through conveyor structure alongwith the Conveyors-54,49,
ECHP-II- Strengthening of existing weak cable gallery structure from back side of SCH-II to near by old crusher by providing side support works.
Supply of Box type bar for Unit IV Scrapper Conveyor Feeders
Fabrication Supply of 500NB 450NB SS 316 Gr pipes and fittings for Unit V Ash water tank incoming line for stage III Ash Water Pump House
Supply of High Abrasive Resistance Heavy Duty FRP Pipe suitable for 350 NB Ash Slurry disposal lines of Unit IV and V
Supply of High Abrasive Resistance Heavy Duty FRP Pipe suitable for 250 NB Ash Slurry disposal lines of Unit I to III