Loading…
Loading…
1,394 results • Recent activity
Operating of Sewage Treatment Plant at Thermal Nagar for the period from 01.04.2026 to 31.03.2027
TTPS Mech II BM Unit II Replacement of wornout corroded structural supports painting of structurals removal of existing wornout G I. sheets and providing new galvalume sheets in 32 Mtr elevation above hot air duct and 52Mtr elevation above walk way i
Cleaning of Collection Chambers, Branch Sewer Lines and Open Drain, removing the spreaded polythene and other waste papers at Thermal Nagar for the period from 01.04.2026 to 31.03.2027
Cleaning and White Washing Water Tanks of Type 1 Quarters and GLRs at Thermal Nagar for the period from 01.04.2026 to 31.03.2027
TTPS Mech II BM Unit II Boiler Dismantling Erection testing and commissioning of Silencer for Startup vent in Unit II Boiler during forthcoming 2025 2026 overhaul
Cleaning of Septic Tanks in Type 1 Block No. 38 to 45 and Temporary Quarters at Camp 1 premises for the period from 01.04.2026 to 31.03.2027