Loading…
Loading…
1,394 results • Recent activity
TTPS Operation Circle MPM I Unit II Rectification of wornout bunker vertical wall in south side of Bunker 2C.
Operating the Sewage Treatment Plant at Analmin Nagar for the period from 01.04.2026 to 31.03.2027
TTPS Operation Circle MPM I Unit II Removal of all the damaged insulation in the Hot Primary Air ducts from Air preheaters to mills and insulating the ducts with LRB wool mattresses and cladding with G.I sheet of 0.63mm thickness and removal of ash a
Regular Maintenance to the existing lawns, flower beds, hedge plants and trees etc., in the Inspection Bungalow at Analmin Nagar for the period from 01.04.2026 to 31.03.2027
Providing Catering arrangements and Maintenance of Suits and Annex Buildings of Inspection Bungalow at Analmin Nagar for the period from 01.04.2026 to 31.03.2027
Operation and Maintenance of Water Supply Pumps and Filling of Water to Overhead Tanks of Type 2 and Type 5 1, 2, 3 Quarters and Non Residential Buildings at Analmin Nagar for the period from 01.04.2026 to 31.03.2027