Loading…
Loading…
1,394 results • Recent activity
ECHP-II- Attending Electrical maintenance of equipments in Switch Gear-VII, Conveyor-68, 69, 70 71 and Link Conveyor
ECHP-II- Attending to Preventive and breakdown maintenance of electrically operated 14 Nos. of Hoist from Conveyor-48A,48B to Conveyor-72 at CHS V area
ECHP-II- Attending Preventive and breakdown maintenance of electrically operated 16 Nos. of Hoist from conveyor 65 to 71 at CHS VII area and Link Conveyor
ECHP II Attending Preventive and breakdown maintenance of electrically operated 16 Nos. of hoist at Primary Crusher House -II and Secondary Crusher House-II
ECHP-II Clearing the coal coal dust and foreign materials daily on walkways of both side return side under belt throughout conveyors deck sheet and tail end areas monitoring cleaning and checking the mechanical equipments of conveyor 72 73 .
Maintenance of Bottom Floor and Side Wall upto 3mtr. height of RCC Chimney 1 and 2 by Water Washing for the period from 01.04.2026 to 31.03.202