Loading…
Loading…
192 live98 closing this weekmost from Central Coalfields Limited and Coal India Limited
192 results • Latest
Movable Stand for Mounting Digital Display (Q3) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
Custom Bid for Services - Conducting of Awareness Campaigns against vector Borne Diseases during monsoon season and distribution of Mosquito nets as well as blankets shawls during winter months within Command Area of Barka Sayal area CCL Similar Category Cleaning, Sanitation and Disinfection Service - Outcome Based
One time annual repair and maintenance of existing community places at different locations under GM Unit of Dhori Area
Civil landscaping and plantation works for final mine closure activities at Ray Bachra underground Project under GM Unit, Piparwar Area.
Replacement of cabin safety glass, repairing and fit-ting of idler pulley adjuster, repairing and cleaning of ra-diator and engine oil cooler, repairing of A.C, repairing of 01 no alternator of Dumper 10352 at AKKOCP
Changing of upper and lower damaged radius arm eye housing and new bushing fitting and welding of broken mounting eye and Repairing of output shaft of Damper assembly, drive line opening and Damper assembly dismantling of Dumper Sl. No 10327 at AKKOC
Repairing of roller guard, providing of mounting Nut-bolts, repairing of both side propel gear box driving sprocket shaft, providing and ma-chining of GM bush, track chain opening and fitting work using gas cut-ting and welding of Drill SL. No. 775
Repairing of idler pulley, repair of failed greasing sys-tem, fabrication of engine sump guard and transmission line steel tubes, Re-pairing of hydrau-lic tank guard, Re-pairing of EGR tubes of Dumper Sl. No.- 10282 of AKKOCP, BnK Area
Replacement of mounting pad, repairing of transmission guard,fabrication of transmis-sion mounting bolt,repairing of drive line, flange repairing of spider assly, transmission flange repairing drive shaft repairing of PL 270 at AKKOCP
Repairing of both side track tensioner housing broken bolt remove, seal changing, fitment of 08 nos. lower roller and chain guard after remov-ing 10 nos. broken bolt, tap threading, both side sprocket replacement with all hole making of 11902 at AKK
A)Repairing and fitting of roller with frame (80 Nos.) and (B)Repairing of supporting structure of unit no. 268 at 00 level in Hy. Cy. Section at KTW
Annual statutory testing of tools and tackles and stability test for different sheds of CRS Barkakana , CCL as per guidelines of Jharkhand factory ACT 1950
Laying of hume pipe for the Diversion of Nalah near WB No. 11 and 12 of Magadh OCP under M-S Area, CCL
Repairing of worn out sprocket assy, idler with bracket and housing in RECP C650D Drill Sl. No. 713, CIL No. - RDC1411, repairing of idler with bracket and housing in IDM 30 Drill, Sl. No. - 853, CIL No. - RDC1316, Re-pairing of muffler assy. used
(A)Transporting, laying and fixing of 150mm dia. GI/MS pipeline from surface tank to 5L/7MD, 5L/7MD to 32L/7MD, 32L/7MD to 32L/4MD(Benti block), 32LW/4MD to 44LW/4MD(Benti) and (B) Time to time shifting of 1000 GPM pump-motor complete sets including
AMC for complete overhauling thorough cleaning and testing of 05 numbers of Radiators Main Radiator and Charge Air Cooler or CAC Radiator and 32 numbers of specialized Oil Coolers belonging to the BH100 Dumper of Rajrappa Project
Handling, Transport and Other Mining Services - Percentage quote based - Handling Service, Transport Service, Handling & Transport Service, Loading and Transportation of 20016 Te Coal from Coal Stock yard number 11 of Kedla OCP to Kedla Washery under..
Handling, Transport and Other Mining Services - Percentage quote based - Handling Service, Transport Service, Handling & Transport Service, Loading & Transportation of Washery- III Grade 35, 000 Te Coal from Jharkhand OCP to Kedla Washery for a period ..
Calibration Services - Mechanical, Thermal, Any; Mass and Volume, Temperature, Density, Dimension; NABL Labs; Buyer premises (onsite)
Repairing and reconditioning of 08 no. of 10HP submersible pump, 03 no. of 15HP submersible pump and 05 no. of LT starter for submersible pump sets installed under Sarubera Project under Kuju Area.
Repairing of E M shed at Base Workshop under Rjrappa Project
Repairing and part rewinding of 03 Nos 3.3 kv ht motors attached with 2000 GPM and 1000 GPM pumps installed at different locations at AADOCM under Dhori Area.
Erection of double and triple layer fencing at High Wall edge, Old Working area and Patch-A to Patch-E with Channel and Cross Drainage work under AADOCM, Dhori Area.
Extension/ Erection n Dismantling of HT Overhead Lines of 3.3KV n 6.6KV for the period of F.Y. 26-27 on as when and where required basis at mines and to restoration of power in overhead line in exigency at mines of Rajrappa Project
Dismantling, Fabrication, Erection, Fitting and Repair of Vibrator Tray Receiving Chutes, Tray Chutes and Discharge Chutes of Chute Nos. 02, 03, 04 and 05 (Store Side) and Chute Nos. 04 and 05 (Road Side) of Main Plant, Sawang Washery.
Washing and painting of Community places (Durga Mandap and Kali Mandir) in Topa Colony under Topa OCP, Kuju Area.
Shifting of pump motor set of capacity 1000-3000 GPM with accessories and laying of suction at section-I and section-II mines of Rajrappa OCP as required during monsoon
Repair of CCL Guest House Boundary Wall and Backyard Shed, minor repair work at PO office and arrangement of platform for pump at ROCP under rajhara area.
Supply and installation of 3.3KV Grade,190 ohms,10A NGR with safety features and accessories required to be installed with 1MVA , 11KV/3.3KV Transformer at Mine substation of Karma Project under Kuju Area.
Pump shifting, lowering and installation with 150mm and 200mm dia MS/GI pipeline works at Karma Project under Kuju Area.
Supply and installation of 3.3KV Grade,190 ohms,10A NGR with safety features and accessories required to be installed with 1MVA , 11KV/3.3KV Transformer of Ara colliery under Kuju Area.
Fabrication and erection of radium base ACP sheet board for guidelines issued for road weighbridges and checkpost of Topa Project under Kuju Area.
Providing 01 no new barrier near entry the entry side of mines haul road and repairing of 01 nos. existing barrier at TOPA OCP under Kuju Area.
Repair and maintenance of damaged internal electrical wiring of residential quarters under GM Unit, NK Area.
Repairing of 1200 GPM, 150m Head Flowmore Pump under Birsa Open Cast Project.
Supply and installation of 8 Nos. of lightening Conductor along with supply and installation of 2 set (6 No.) of station type Lightening arrestor to be installed at different locations of Ara colliery under Kuju Area.
Replacement of unserviceable silica gel with breather of different transformer at different places under Jarangdih Colliery.
Erection, Dismantling, Shifting and Maintenance of 440V/220V Overhead (OH) Line on as and when required basis for a period of 365 days (1 Year) under Birsa OCP.
Handling, Transport and Other Mining Services - Percentage quote based - Handling Service, Transport Service, Handling & Transport Service, Loading and Transportation of 55, 000 Te Coal from Tapin North OCP Coal Stock Yard to Kedla Washery for a perio..
Professional Training Services (Version 2) - offline; Weekdays
Custom Bid for Services - Implementation of Blanket Distribution Project in Command Area under Corporate Social Responsibility (CSR) of CCL, 2026-27 Similar Category Outsourcing Delivery of Public Service as a Project CSR Project Monitoring, Evaluation and Impact Assessment Service
Desk and Bench Set for Classroom/Training Area (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
Routine Maintenance and servicing of all DG sets for a period of one year under GM Unit M-S Area
Diversion of existing JBVNL (11KV/415 V) overhead electrical lines at the Chamatu patch, Ara patch of Magadh OCP to prevent damage to electrical infrastructure from mining activities and ground clearance for mining activities
Safety Audit ,Fire safety audit , Hazard Identification and Risk Assessment , Disaster management plan and emergency plan as per guidelines of Jharkhand factory act 1950 at CRS BARKAKANA , CCL
Repair of existing platform of Tetariakhar OCP and arrangement of platform for placement of CAAQMS at Rajhara OCP, under Rajhara Area.
Bus Hiring Service - Regular Basis - Local; 52 Seater; COMPANY MANUFACTURED SCHOOL BUS; 2400 Km(s)*300 Hr(s); Diesel; NOT MORE THAN 05 YEARS FROM THE DATE OF FIRST REGISTRATION FROM THE DATE OF OPENING OF TENDER
Dissolved Acetylene (Gas) (V2) Conforming to IS 308 (Q2), Oxygen, Compressed Gas and Liquid (V3) Conforming to IS 309 (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete