Loading…
Loading…
3,166 results • Recent activity
Laying of HDPE pipe and lay flat hose (490 mtr length) from main dewatering pie line of patch A towards coal stock 90 for prevention of spontaneous heating of coal and (2) Laying of ms pipe 150 mm dia length 790 mtr from departmental patch to OB d
Repairing and rewinding of 250 KVA, 3.3KV/440V local Sl. No. BHK/OWS/Tr-24 oil cooled transformer under Bhurkunda Colliery.
Cutting and Cleaning of Catch drain and sump arrangement around OB dump and Laying of hume pipes at different locations at TTK OCP under Rajhara Area
SO(EnM)/GRD/E-NIT/26-27/03 Dtd- 11.04.2026
Dismantling, shifting and installation of 500 GPM pump along with pipeline work for matching installed at 3 no. old Makoli sump under Tarmi OCP
Replacement of unserviceable silica gel with breather are required for protect from moisture of different transformers at different places under Kathara Colliery.