Loading…
Loading…
3,164 results • Recent activity
Shifting, dismantling and laying of pipe line 8 and 10 dia of various pumps installed at Patch A as per requirement for meeting day to day requirement for duration of 6 months(during monsoon) under Ashok OCP PPR Area.
Job.1 Repairing and reconditioning of 150 LPS, 100mtr head pump Make Sykes Sl No P-2 P-5 for dewatering / providing water at filling points of Piparwar Area under Ashok OCP PPR.
Repairing of both sides front wheel hub assembly, both hoist cylinder eye holes, both side steering cylinder , drive line assembly and tie rod as-sembly of BH60M Dumper Sl. No. 60940 and 60941 of Birsa OCP
Annual maintenance contract (AMC) for the period of one (01) year for 01 (one) Nos. Portable Weighbridges No. 2 (Road WB 60Te capacity Pragati make) under Jarangdih Colliery.
Repairing/rewinding of 03 Nos. Induction Motor RPM 1480, Volt 550, Nameplate Nil (A) 90KW, 550V, Sl. No. JRD/120HP/550V/01, make Kirloskar installed at Damodar Pump house (B) 55KW, 550V, Sl. No. JRD/55KW/WS/02, make Kirloskar installed at Damodar Pum
Dismantling and re-erection of Fixed Type High Mast Lighting Tower installed at Sirka OCP