Loading…
Loading…
3,136 results • Recent activity
Supply and installation of Early Streamer Emission Tyre external lighting arrester system with complete accessories at Karma Project of Kuju Area.
Changing and shifting of 19 mm and 22 mm steel wire rope and drive pulley of washed coal power winch machine at loading section at Sawang Washery.
Annual Maintenance Contract (including replacement of spare parts) of R O Water Purifiers, Capacity 80 ltrs. For providing of pure drinking water under Sawang Washery for the period of three (03) years.
Supply, Installation and Commissioning of 03 Nos. Diesel Hydraulic Backhoe Excavator 5-6 CuM
Repairing and full overhauling of different switches/Gate-End (A) 03 (Three) nos of Gate end Box Switch Gear of SDLs, (B) 03 (Three) nos of ACB 100A Andrew Yule make switches (controlling switch of different M/Cs), (C) 06 (Six) no. 200A ACB switches
Cleaning/Repairing of radiator assembly, hydraulic oil cooler and compressor oil cooler for Drill RDC-1289/6021401 and RDC-1401/6021703 of GVP Ph-II OCP.