DISSOLVED ACETYLENE GAS, LIQUID OXYGEN GAS
Renovation of substation by installation commissioning of float cum boost charger and transformer monitoring system up-gradation of bays at main substation of SDOCM, Dhori Area.
Day to day requirement of cutting and welding work at feeder breaker for a period of six months in r/o AADOCM, Dhori Area
Work for fresh wiring work in D9 and B54 and executive hostel at GM colony Dhori Area
A) Supply of Vertical/Horizontal GOAB switch operating mechanism 11 KV grade, 800 A B) Installation of GOAB switch with required iron materials C) Installation of the GOAB switch on existing pole D) Overhauling E)Installation of Xformer in Township
diversion of existing HT Overhead Line of 6.6KV of feeder No.22 going to Koihara village for extending OB dump at Sec II (new patch) of Rajrappa Project.