Loading…
Loading…
10,886 results • Latest
RMO Electromechanical services at the residence of HMPs Lok Sabha and Rajya Sabha at BKS Marg, Dr. B. D. Marg and DDU Marg, under SD-III, DED-201, New Delhi. Sub Head- Comprehensive maintenance of Daikin make VRV/VRF system.
A/R & M/O to Residential and Non-Residential Building for Income Tax Department at Ujjain. SH:- Providing services of Sewer man, Beldar for day to day maintenance at residential and non-residential Building of Income Tax at Ujjain.
C/o One tower Office building and another tower Residential Quarters i/c internal water supply, sanitaray installation and all development and bulk services, horticulture works on EPC mode-I basis for Ranga Reddy, Secunderabad of Central Tax at Khajaguda, Hyderabad. SH: Providing/hiring of 1 No. Petrol/ Diesel/ Electric inspection vehicle i/c driver for official use of AE(E)-II, O/o EE &SM (E), under CE CUM ED, CPWD, Hyd. Subwork/Packages: Providing/ hiring of 1 No. petrol/ Diesel/ Electrical inspection vehicle i/c driver for official use of AE(E)-II, O/o EE & SM (E), under CE Cum ED, CPWD, Hyderabad.
Upgradation/ Special repair work of Type-VI (C-I & C-II type) quarters at Kaka Nagar and Bapa Nagar under 5/L sub division, CPWD, New Delhi during 2026-27. SH- Renovation and repair of kitchen, toilets, floors, cupboards, doors, windows, damaged sewer line and other misc. civil works.
SITC of CCTV Camera with Audio-Video recording and other miscellaneous EI Work in Kendriya Bhawan, Aliganj, Lucknow.
Installation of EV charging points at SPG complex Dwarka Sector-8 New Delhi (SH -Electrical works)
A/R & M/O & S/R TO GST BHAVAN OFFICE BUILDING AT NEW MARINE LINE, MUMBAI - 20 DURING 2026 - 27. SH : INTERNAL PLASTERING, PAINTING, REPAIRING OF DOORS & WINDOWS, CLEANING OF TANKS AND OTHER MISC. WORKS.
Providing sewer line soak pit, manhole including cleaning of all existing manholes and sewer lines and removing of silt and sludge from septic tank at GPRA Colony, Bambolim, Goa.
A/R & M/O I.P. Bhawan, Drum Shape Building, C.R. Building and old CAG Building, during 2026-27 (SH: Cleaning & desilting gully trap chamber, chocked sewer line and underground water storage tank)
Special repair to Raj Ghat improvement of Raj Ghat Samadhi parking area, New Delhi (SH: Misc. Civil work at CISF Check Post near Raj Ghat Parking)
Construction of office building including annexe building and development of bulk services of Indian Audit and Accouts Department (IA&AD) at Sector-10/A, Gandhinagar Gujarat on Engineering, Procurement and Construction basis of EPC. Subwork/Packages: Providing services of computer opearator in O/o Assistant Engineer-I & Providing architectural draftsman for O/o Architect, CPWD, Gandhinagar.
1. MOEI Pool Residential Building under SD-III. 2. MOEI CPNR Building under SD-III (Sh:- Providing inspection vehicle along with driver for O/o Executive Engineer (Elect) Shimla Central Electrical Division, CPWD, Longwood Shimla ) Location:- Longwood
Construction of 200 Capacity Hostel (G Plus 3) and Workshop Building (G Plus 1) including Electrical and Horticulture works at MSME, IGTR Indore (M.P.) SH- Providing and Fixing of Electrical Accessories
A/R & M/O residential building of DGMS at Dhanbad during F.Y. 2026-27 (SH: Repair, Painting and misc. work for Type-IV and above Qtrs. Golf Colony, DGMS, Dhanbad, Jharkhand)
Renovation of cafeteria at Raj Ghat Parking, Raj Ghat, New Delhi
Repair and Maintenance of Toilet Blocks of Boys Hostel & Girls Hostel and Replacement of Sewer Lines at EMRS, Sohagpur, Shahdol (M.P.).
AR&MO Repair & maintenace of damaged broken water connection lines and certain misc day-to-day maintenance works at RCC, New Delhi
Repair and Maintenance of School Building, Junior Hostel, Senior Hostel, Mess and Other Associated Buildings including Water Supply, Sanitary Installations and Drainage System at EMRS (Barbaspur), Anuppur, Madhya Pradesh.
ARMO of GPOA and GPRA Campus at Ashiana Digha Road, Patna. (SH - Repair and Replacement of Firefighting Pipes and vales at Karpoori Thakur Sadan) Subwork/Packages: Repair and Replacement of Firefighting Pipes and Valves at Karpoori Thakur Sadan
Providing Services of Computer Operator & Dak Boy for Various day to day office works at office of DDG (HQ), Vidyut Bhawan and O/o The Chief Engineer (D&DM) National CPWD Academy, Ghaziabad during 2026-27.
ARMO of GPOA and GPRA Campus at Ashiana Digha Road, Patna. (SH - Replacement of defective CCTV Camera and LED display at Karpoori Thakur Sadan)
Providing and Fixing Iron Grill Entrance Gate and Collapsible Gates at Various Location in South Block during 2026-27.
Annual Maintenance and Operations of Internal & External Electrical installations at GSI Dharitri Building at GN-40, Salt Lake, Kolkata. (SH: Providing man power services for day to day maintenance of IEI, External EI & operation of goods & passenger lifts, Fire fighting system and Fire alarm system).
Construction of academic block G plus 4 and Hostel block G plus 5 including allied services at IIMC, New Delhi (SH: Electrical work in office extension of DPZ-II, CPWD)
Renovation/Upgradation of Electrical Room, Store Room and Record Room of Sub Division office in Single Storey Building at Jaisalmer House, New Delhi, dg. 2026-27.
Structural upgradation and facade improvement of the GPRA Quarters 100 Nos. Z Type (461 to 552 and 625 to 632) under Service Centre No. 232 (Sub Division 3A) Timarpur, Delhi
Hiring of one number inspection vehicle including driver for the official use of O/o CESD1/III,CCU,Bengaluru
ARMO of Electrical services for National Test House, Marol, Mumbai. (SH- Operation and Maintenance of E & M services).
ARMO of E & M Services of RTI & Hostel for CAG of India on Plot No. C-2, GN Block, BKC, Mumbai. (SH- Operation & Maintenance of Low side Equipments of Air cooled HVAC System. Subwork/Packages: Operation & maintenance of Low side Eqipments of Air cooled HVAC system.
Comprehensive Maintenance of GPRA Complex Minto Road Complex & Mirdard Lane (SC 255) and (SC 256) under the jurisdiction of L- Division during the year 2026-27 & 2027-28. SH- Civil and E&M works.
ARMO of E & M Installations of 112 Nos. Type -3 flats & Hostels and 72 Nos. Type-4 flat for ITO at Yashodham, Goregaon, Mumbai. (SH- Comprehensive maintenance of Passanger lifts.)
ARMO Electrical & Mechanical equipment at AIIPM & RC Hospital at Haji Ali, Mumbai. (SH- SITC of tower type split Air Conditioner system in workshop building.)
ARMO of Electrical and Mechanical services for Bldg No. 9 for 28 Nos. Qtrs of Income Tax department at Kalanagar, Bandra (E), Mumbai. (SH- Operation and Maintenance Work).
SITC of commercial FRP sand filter repair and TC of existing defunct water softening plant and SITC of UV filtration and operation and maintenance for 03 years at campus of Nivedita Kunj at sector 10 R k Puram New Delhi -110022
Conversion of Border Security Fence from Phase III to New Design Fencing along IBB in Tripura Sector from BP No. 2036 5S to 2046 3S 15.100 KM from BP No. 2050 M to 2060 4S Length- 12.647 Km from BP No. 2063 10S to 2064 7S Length- 2.122 Km and from BP No. 2066 8S to 2071 3S Length- 6.668 Km. Total length 15.100 Plus 12.647 Plus 2.122 Plus 6.668 - 36.537 KM. SH: Conversion of Border Security Fence from Phase III to New Design Fencing along IBB in Tripura Sector from BP No. 2050 M to 2060 4S - 12.647 KM. Total length- 12.647 KM. Package- II
Upgradation replacement of Phase III fence to new design fence from BP No. 1992 54S to 1998 26S Length- 6.023 KM and from BP No. 2018 2S to BP No. 2036 5S Length- 25.227 KM Total Length 31.25 KM in AOR of 42 BN BSF under SHQ BSF Gokul Nagar of Tripura Frontier in Tripura State along Indo Bangladesh Border IBB. SH: Upgradatio replacement of Phase III fence to new design fence from BP No. 2018 2S to 2029 2S 16.327 Km Total length- 16.327 Km. in AOR of 42 BN BSF under SHQ BSF Gokul Nagar of Tripura Frontier in Tripura State along Indo Bangladesh Border IBB. Package- II
Conversion of Border Security Fence from Phase III to New Design Fencing along IBB in Tripura Sector from BP No. 2036 5S to 2046 3S 15.100 Km from BP No. 2050 M to 2060 4S Length 12.647 Km from BP No 2063 10S to 2064 7S Length 2.122 Km and from BP NO 2066 8S to 2071 3S Length 6.668 Km Total length 15.100 plus 12.647 plus 2.122 plus 6.668 total 36.537 Km. SH: Conversion of Border Security Fence from Phase III to New Design Fencing along IBB in Tripura Sector from BP No. 2036 5S to 2046 3S 15.100 Km Total Length 15.100 KM. Package-I.
Construction of Boys / Girls Hostel Building (G plus 7) under Phase-I for IISER Kolkata at Mohanpur, Nadia (WB). SH: Building work including pile foundation, internal water supply, sanitary installation, drainage, pathway, internal & external electric installations, fire-fighting, fire alarm system, occupancy sensor, LAN & CCTV (only wiring), passenger lift and kitchen ventilation system
Conversion of Border security fence from Phase-II to new design fence in between BP No 846/7-S to 860/7-S - 6.080 Km, BP No 860/7-S to 876/2-S - 12.20 Kms, BP No 876/2-S to 900/MP - 30.20 Km, BP No 900/MP to 925/MP - 1.00 Km, BP No 978/1-S to 981/10-S - 5.538 Km and BP No 984/MP to 984/16-S - 2.486 Km (Total - 57.504 Kms) in Cooch Behar District of West Bengal. SH Replacement of Border Fencing Phase-II to NDF in between BP No 892/5-S to 900/4-S - 10.00 Km under Mathabhanga Sub Division (Total - 10.00 Kms) in Cooch Behar District of West Bengal under Guwahati Frontier (Package-IV).
Conversion of Border security fence from Phase-II to new design fence in between BP No 846/7-S to 860/7-S - 6.080 Km, BP No 860/7-S to 876/2-S - 12.20 Kms, BP No 876/2-S to 900/MP - 30.20 Km, BP No 900/MP to 925/MP - 1.00 Km, BP No 978/1-S to 981/10-S -5.538 Km and BP No 984/MP to 984/16-S - 2.486 Km (Total - 57.504 Kms) in Cooch Behar District of West Bengal. SH Replacement of Border Fencing Phase-II to NDF in between BP No 861/1-S to 879/16-S - 17.20 Km under Mathabhanga Sub Division (Total - 17.20 Kms) in Cooch Behar District of West Bengal under Guwahati Frontier (Package-II).
Consultancy services for preparation of Detailed Project Report for construction of 5 Nos Brdige including Grill/Drop Gate at different location (GIN 287 GIN 291 (2 NOS) GIN 328 and GIN 331) and construction of 10 Nos Grill/Drop Gate at different locations (GIN 286A GIN 290A GIN 290B GIN 290C GIN 298 GIN 299 GIN 300 GIN 301 GIN 302 and GIN 302A) along Indo Bangladesh Border in Cooch Behar Distrcit of West Bengal.
Construction of 16 Court Buildings Complex (Stilt plus 5 upper floors) including MEP services, bulk services and development works at Daminedu, Tirupati District, Andhra Pradesh
MOEI and Fans i/c Pump set, Street light in Phase I,Sector VII, Antop Hill, Mumbai 37.SH: Electrical installation Renewal and Distribution system strengthening at CGS colony for Bldg No 149, Phase I, Sector VII, Mumbai 37. Subwork/Packages: MOEI and Fans i/c Pump set, street light in Phase I, Sector VII, Antop Hill, Mumbai 37. SH: Electrical installation Renewal and distribution system strenghtening at CGS Colony for Bldg No 149, Phase I, Sector VII, Mumbai 37.
Addition and Alteration to Income Tax Residential Building at Sector-VII, Antophill, Mumbai - 400 037 during 2026-27. (SH. - Electrical upgradation and renovation of 1 No. Type-IV quarter, 7 Nos. Type-III quarters, 11 Nos. Type-II quarters and 5 Nos. Type-I quarters at Sector-VII, Antophill, Mumbai-37.) (For 1 No. Type-IV, 2 Nos. Type-III, 8 Nos. Type-II & 3 Nos. Type-I Quarters, Sector-VII) Subwork/Packages: Addition and Alteration to Income Tax Building at Sector-VII, Antophill, Mumbai - 400 037 during 2026-27. (SH. - Electrical upgradation and renovation of 1 No. Type-IV quarter, 7 Nos. Type-III quarters, 11 Nos. Type-II quarters and 5 Nos. Type-I quarters at Sector-VII, Antophill, Mumbai-37) (For 1 No. Type-IV, 2 Nos. Type-III, 8 Nos. Type-II & 3 Nos. Type-I Quarters, Sector-VII)
Upgradation of electrical installations in GPRA Residential Colony, Sector VII, Antop Hill, Mumbai 37. SH:- Strengthening and illumination optimization of external lighting infrastructure through deployment of energy-efficient luminaire systems to eliminate low visibility zones in Horticulture plant store area at Phase II, Sector VII, Antop Hill, Mumbai 37.
Upgradation of 2 Nos. Type-III quarter at Mukundnagar, Pune.
Construction of 24 Nos. Type II Two blocks of stilt plus 3 floors, 12 Nos. Type III quarters Two blocks of stilt plus 3 floors for 142 BN BSF at Karahalli, Bangalore.
Executive Table (V4) (Q2), Computer Table (V3) (Q2), Revolving Chair (V5) (Q2), Chair for General Purpose (Q2), Steel Almirah/Cabinets (V4) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
A3 Size Multifunction Printer (MFP) (Q2)
Migration and Restoration of Milestone VMS system at NATGRID, Yelahanka, Bengaluru.