Loading…
Loading…
10,893 results • Latest
Carriage of earth from New Staff Training College for Punjab National Bank at Plot No. CBD-91 at International Financial Hub, New Town, Kolkata to SAMEER Kolkata, Action Area IIE, New Town, Kolkata-700161.
Construction of Boundary wall around Directors Residence , Steps in arch shape near sports complex, festive flag poles and kitchen cabinet in Staff residence in the new campus of IIM Bodhgaya Bihar Subwork/Packages: Supply of office assistant for locking & unlocking and watch & ward for o/o the SE&PD, and EE&SM(C)-I, BGPC, CPWD Bodhgaya Bihar
Construction of MI Room at 173 Bn CRPF, Dimapur (Nagaland).
Comprehensive Consultancy services for Costruction of grill/drop type gates at different bridge locations for GIN 522B, 549, 556, 558, 559, 561, 561A, 562 & 576 (9 Nos.) including design and drawings for construction in Karimganj District under SHQ (M&C), BSF, Silchar, assam along Indo-Bangladesh Border (3rd Call)
Retrofitting, Structural Strengthening and Renovation Work of Science Block & Academic Block building at Kirori Mal College, University of Delhi. (SH: Civil and E&M works).
Providing High mast tower lighting system for Athletic track and Cricket Ground at Academic Zone in IISER Campus, Tirupati, Andhra Pradesh.
Providing Design Consultancy Services for C/o Infrastructure (KLP) for various units/sub units at NSG Camp Palam, New Delhi (SH: Civil & Electrical works).
Making Arrangements for celebration of Independence Day 2026 at Red Fort, Delhi. (SH: Providing temporary security lighting and wiring for power outlets for metal detectors etc.)
MOEI of various E & M works at Non-GPRA, Sector-7, Antophill, Mumbai-37. Sh-Replacement of old & outlived energy-efficient staircase light fittings and erthing arrangement to ensure the safety of meter cabin Non - GPRA, Sector-7, Antophill. Subwork/Packages: MOEI of various E & M works at Non - GPRA, Sector-7, Antophill, Mumbai-37. Sh- Replacement of old & outlived energy-efficient staircase light fittings and erathing arrangement to ensure the safety of meter cabin Non - GPRA, Sector-7, Antophill.
Annual Routine Operation & Maintenance of Internal and External Installations at GPRA Colony, Akurdi, Pune.
Unbranded Pouch of 100 Tags For Files of lace length 175 mm
Kangaro Box of 1000 Staple Pins of size 10/4
SHARP OEM Drum Manufactured by SHARP BUSINESS SYSTEMS, SHARP OEM Drum Manufactured by SHARP BUSINESS SYSTEMS (INDIA) PRIVATE LIMITED
Kangaro Stapler Compatible for Pin Size 10/4 of Throat Depth, Kangaro Stapler Compatible for Pin Size 10/4 of Throat Depth 63 mm
SHARP OEM Toner Cartridge Manufactured by SHARP BUSINESS, SHARP OEM Toner Cartridge Manufactured by SHARP BUSINESS SYSTEMS (INDIA) PRIVATE LIMITED
UNIK Elbow, Equal, 135 Degrees 15 mm 22 mm
SWASTIK PLY--SWASTIK PLY & DOOR INDUSTRIES Plywood for General, SWASTIK PLY--SWASTIK PLY & DOOR INDUSTRIES Plywood for General Purposes Marked to IS 303 MR (Moisture Resistant) grade
Minor repair and Painting of Mega Mess, Hostels I,J & K including boundary wall and Minor Repair of RCC Chajja, Replacement of damaged Door/Window, Renovation of damped Toilet, Water Proofing and Painting of Hostel A,B,C,D,E,F,G,H, AHR, RLB including boundary wall and their Messes at NIT Jamshedpur, Jharkhand. (SH: Renovation of Toilet & Bath for Hostel A,B,C,D,E,F,G,H,I, AHR, RLB and their Messes at NIT Jamshedpur). Subwork/Packages: work
Operation and Maintenance of Electrical and Mechanical installation at Income Tax Department Staff quarters at Road No 10 & Road No 12, Mehdi Manzil guest house, Community Hall at Road No. 12, Banjara Hills, Hyderabad for the year 2026-27. SH: Operation & Maintenance of Internal electrical installations, street lights including operation of WSPS at Road No. 10, 12, Mehdi Manzil guest house & Community Hall at Road No. 12 including 1 No. 6 Passenger Lift.
Operation and Comprehensive Maintenance of Substation, Street lights, AC Units, Fire Alarm System, Wet Riser System and DG sets installed at Aayakar Bhavan & GST building, Hyderabad the year 2026-27. SH: O&M of IEI & fans including 11 KV Substation, Water supply pumpset, DG sets, fire Alarm System, Operation of Lifts.
Providing of 11 kV Substation with VCB panel, RMU Panel, Transformer, LT panel Board and UPS at NBAIR, Attur, Yelahanka, Bangalore.
MOEI and Fans,R/M of P/Set at New CGO Building Mumbai-20 Subwork/Packages: Replacement of IEI in Store No 1,2 and 3 of Stationary Department located at Ground Floor Nishtha Bhawan Mumbai-20
ARMO of Electrical and Mechanical Equipments at Pratishtha Bhawan(Old CGO)Building Mumbai 20 Subwork/Packages: Providing Service and Maintenance of Computers and Printers for CPWD Offices in Annexe Building and Office of EE(E)Mumbai I,Sub-Division II and IV Except 14th Floor
ARMO of Electrical Installations and Specialised Electrical and Mechanical Services for New Custom House,Ballard Estate,Mumbai SH:-Outsourcing of Day to Day Maintenance Works for the Year 2026-27
C/o 03 Nos 120 Jawan barrack including 01 Nos Generator Room for 37th Bn ITBP Campus at Thiksey, Leh Ladakh (UT). (sh:- Providing servoces of MTS and Computer operator at the office of Assistant Engineer, Leh Central sub Division, Leh Ladakh.)
ARM works (Electrical) at ESIC Hospital Kakinada along with 32 Residentail Quarters. SH: Comprehensive Annual maintenance of 2 Nos 60KVA UPS of Vertiv Make.
Waterproofing treatment to terrace miscellaneous works in kitchen and dining area and renovation of attached toilets of old boys hostel building SH Development works near old boys hostel building and other miscellaneous works at SRFMT and TI Campus Tractor Nagar Garladinne Anantapur Andhra Pradesh
A/R and M/O Honorable Ministers and MoS Bungalows under 3/B Sub-Division of B-Division during 2026-27. (SH: Providing services of Computer Operator & MTS)
Construction of 40 Women Barracks (1 No.) including internal water supply, sanitary installations, development works and electrical works at 08 Bn., SSB Khaprail under SSB Frontier, Siliguri.
MOEI & fans and other electrical accessories of HMPs Bungalow under Sunehri Bagh Road, SD-2, DED-201, New Delhi (SH:- Pdg of EPABX system at Meena Bagh Enquiry office)
Construction of compound wall at remaining part of the HRF in phase-II and Phase-III at HRF Hayathnagar Hyderabad SH Providing services of inspection vehicle & LMV driver on monthly basis for the office of AE HYD-1/2 GC CRPF Chandrayangutta Hyderabad
MOEI and Fans RMO of water supply pump sets street lights and sub station equipment at NS building Nagpur for the year 2026-27 Subwork/Packages: Operatin and maintenance of E & M installation
Painting of the class room complex and Academic Block at VNIT Nagpur
Internal and External Painting of Hostel Building Ramanujan Hostel HB 2 Homi Bhabha Hostel HB 3 and Swadanand Mess old Mega Mess at VNIT Nagpur
C/ o 100 bedded ESI Hospital building at SIPCOT Tuticorin, Tamilnadu (SH: Providing the services of Draftsman, computer operator, sweeper for the office of Chief Engineer, CPWD Madurai)
Renovation of toilets at DDPR CRI (Homeopathy) Sector-24, Noida Subwork/Packages: Civil work
Provision of Footpath, Plinth protection and replacement of SCI pipe in shafts at NICPR building, sector-39, Noida dg. 2026-27 Subwork/Packages: civil work
Dismantling & Relaying the Existing Power/Data/ Telephonic Cables in the new Cable Management System at EPFO RO Ambattur, Chennai-37.
Installation of Air conditioner in the Mini Conference room of CRCK Kozhikode
CH to contigencies of construction of Type A school building , staff quarters T-II/4 Nos , T-III/4 Nos and T-V/1 No including Dev. work and boundary fencing etc including electrical installation , Fans , fire alarm and fire fighting system , solar photo voltaic power generation and sub station equipments panels etc for Kendriya Vidyalaya Reckongpeo H.P. SH: Providing services of inspection vechicle along with driver etc complete to officials of CPWD
Construction of School Building of 8 Nos. Class Room, 1 No. Lab, 1 No. Staff Room and Vice Principal Chamber and 48 bedded Hostel Building for Ekalavya Model Residential School , Kottadoddi, Block Devadurga, Dist. Raichur. SH : Building Portion including internal water supply, sanitary installations, drainage Internal Electrical Installation, fans and fiitings etc. (Balance Work)
Construction of CC pavement in front of Nano Cellulose Pilot Plant near Yashwantrao Chavan building at ICAR-CIRCOT, Matunga, Mumbai.
Upgradation of Director Bunglow at IMU-Mumbai Port Campus, Hay Bunder Road, Sewri, Mumbai. SH: Providing kitchen cabinet, wardrobe, ACP chajja, SS railing and other misc. work of Director Bunglow at IMU-MPC.
Internal water proofing treatment of STP with plastering and joint sealing at ICAR-CCARI, Ela, Old Goa, Goa
Construction of shed with precoated galvanized iron profile sheets of size 8 x 8 meter at ICAR Junagadh
Upgradation of wiring of 2 Nos Type-V Quarters at CPWD Complex, HSR layout, Bangalore.
Providing Chimney for 8 no of type-V quarters, Replacement of existing metering cubicle panel at Survey of India campus, Koramangala, Bengaluru.
Construction of Canteen, Sentry post, Cycle stand and renovation / upgradation work of 2 Nos. Boys toilets, 02 Nos. Girls toilets and 02 Nos. Staff toilets including repair/renovation work of existing boundary wall, Road work in Kendriya Vidyalaya at Ambha Road, Jigni, Morena. (MP) During-2026-27