Loading…
Loading…
5 results • Recent activity
SHOLINGANALLUR LAKE TO SIPCOT 2 STATION INCLUDING STABLING LINES, VIADUCT BETWEEN THE STATIONS (CH 35044.000 to 44671.000) FOR CORRIDOR- 3 OF CHENNAI METRO RAIL PROJECT PHASE-II.
R.K Salai station to Sholinganallur station including bored tunnel and viaduct between the stations, Cut and Cover tunnel, U Section and Elevated ramp (Ch. 17250.000 To Ch. 35437.030) For Corridor-3 of Chennai Metro Rail Project Phase II.
Including Bored Tunnel between Stations, Cut and Cover Box, U Section and Ramp (Chainage 0 -173 M To 9 Plus 949 M) for Corridor- 4 Chennai Metro Rail Project Phase II
VAC, TVS along with Electrical and SCADA works for 6 UG stations in C5 and 12 UG stations in C3 including integration at OCC level.
VAC, TVS along with Electrical and SCADA works for 16 UG stations in Corridor-3 including Tunnel and Ramp sections between the stations