Loading
Loading…
Loading…
777 results • Recent activity
In Year 2025-26 Special Repair work of CC work in Rajpura to Gora Bhopka in Km 1 (Ch. 0.300-0.500) in abadi portion.
In Year 2025-26 Special Repair work of CC and Culvert work in Husepura to Udotpura link road in Ch. 2 300 to 2.700 CC and Culvert.
Construction work of 3 x 2 x 2 meter box culvert in place of damaged culvert no. 6/1 at km 6 of Paraon Hazariya link road.
Special repair of Mavai Brahman link road in Km 1
Special repair of Kalpi Madaripur to Malthuwa link road in Km 1 (900)
Pot holes and repair work on the roads under Assistant Engineer Fifth