Loading…
Loading…
76 results • Recent activity
Unbranded Pointed Copper clad 1000 millimeter Earthing, Unbranded Pointed Copper clad 1000 millimeter Earthing Rod
ERD System for 9. 4 KW Motor Drive, ERD System for 7.5 kw Motor Drive, Cable 4 core 16 sq. mm, Cable 4 core 25 sq. mm, MCCB for 150A 250A MCCB
Room Kit EQ
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Office Space; Electrical System or Installation, Air Purifier; Service Provider
Desk, Seat, Conferencee Table 50 Seater, Revolving Chair, Conferencee Table 51 Seater, Wall Panelling Frame Work, Wooden Slat Laminated Panel
Storage Chiller inbuilt deselination storage capacity 80 Liters, Supply and fixing of Cartidge 20 inch including testing, Commissioning etc. as required at site., Supply and fixing of Cartidge 10 inch including testing, Commissioning etc. as required at site., Supply and fixing of Pre Carbon10 inch including testing, Commissioning etc. as required at site., Supply and fixing of Post Carbon10 inch including testing, Commissioning etc. as required at site., Supply and fixing of deselination 75-80 GPD Membrane with housing including testing, Commissioning etc. as required at site., Supply and fixing of Membrane Life Enhancer including testing, Commissioning etc. as required at site., Supply and fixing of chiller Pump including testing, Commissioning etc. as required at site., Supply and fixing of chiller SMPS 48 Volt including testing, Commissioning etc. as required at site., Supply and fixing of chiller Gas Charging including testing, Commissioning etc. as required at site., Supply and fixing of chiller TDS Adjuster including testing, Commissioning etc. as required at site., Supply and fixing of chiller Solenoid Valve including testing, Commissioning etc. as required at site., Supply and fixing of one oblique four inch Pipe including testing, Commissioning etc. as required at site., Supply and fixing of three oblique eight inch Pipe including testing, Commissioning etc. as required at site., Supply and fixing of chiller Compressor including testing, Commissioning etc. as required at site.