Loading…
Loading…
1,243 results • Recent activity
Patch repairing by metaling grouting carpeting sand seal coat etc. during the year 2025-26
WBM PMC sand seal coat etc
Patch WBM, Grouting, Re-carpeting and seal coating etc.
Stripping of excess soil Patch soling WBM carpeting sand seal coat Road side pucca drain Protection works etc and allied works
Mtc of road from Boalia-Gopalnagar Road to Chinmaya Harihara Vidhyalaya (L-475.00M) during the year 2025-26/SH Patch soling, WBM, Carpeting,Premix seal coat, Box culvert(1.00X1.00M),Toe wall, drain (L-150.00Mtr) with allied works.
Annual mtc. of residential and non-residential Govt. quarters and office buildings at Teliamura PWD complex during the year 2025-26/SH- Mtc. of PWD staff quarter Type-I, Type-II, Type-III, Non type quarter and office buildings in/c allied works.