Loading…
Loading…
1,311 results • Recent activity
Mtc of various roads under Masaull GP West Masauli Ratacherra GP East Ratacherra GP under the Jurisdiction of PWD R and B Ganganagar Sub Division during the year 2025 26 SH Gunny Bags Filling Patch Repairing Soling Surface Drain Carpeting and Seal Co
Providing internal electrification along with installation of starter and panel installation for AHU and VRF at Gomati District Hospital
Construction of Temporary Structure at roof of existing Civil Engineering building, new Degree Campus of TIT, during the year 2025-26 /SH Construction of RCC, Brick work, Tiles work, Aluminium Works, GCI sheet, pipeline, toilet etc.
Strengthening of Veterinary Health care infrastructure through construction of Veterinary Hospital G 1 storied at Sabroom South Tripura District Phase II Ground floor only Providing Internal Electrification thereof
SH- Grouting, WBM III, Re-carpeting, seal coat, surface drain, palasiding, Gunny bag placing etc. during the year 2025-26. (Portion from Ch.2.50 km to Ch. 3.640 km) (Group- I). (3rd Call)
SH-Metaling, Grouting, Re-carpeting, Tack Coat, Seal coat, Surface drain etc. during the year 2025-26.