Loading…
Loading…
275 results • Recent activity
Shifting of L.I Scheme at Ratanmani VC (Field-I) under RIDF-XXIX during the year 2023-24/SH-Construction of Pump House, Priming Tank,dismantaling and re-installation of centrifugal pump motor set, panal board etc. including works.
Mtc./Renovation of different L.I. and DTW Schemes under Satchand RD Block of South Tripura district during the year 2022-23/ SH- Extension of uPVC distribution system of (i) L.I. Scheme at Gobindamath-IV, (ii) L.I. Scheme at Bajendranagar-III, (iii)
Repairing and maintenance of left bank main canal at different locations from ch. 1960.00 m to 4060.00 mtr under North Jolaibari GP
Raising and widening of embankment by earth filling, Double layer soling,C. C Block,Toe wall, Reconstruction of Sluice gate (Flap Shutter) along with other allied worksat ch 0.00 km to 0.80 km.(Group No-I)
FDR Protection of Fatikcherra Right Bank at Ward No 04 under Radhanagar GP under W.R Sub-Division Kumarghat during the year 2025 26SH Bank revetment work by placing Sand Cement Block for a length of 45.00 mtr.
Protection of Betcherra near market Ward No 01 under Betcherra GP from erosion of river Manu at right bank under Kumarghat Block during the year 2022 23SH Bank revetment work by sand cement block (1 8) for a length of 210.00 m Chainage 210.00 m to 41