Loading…
Loading…
275 results • Recent activity
Anti_erosion work of Bijoy river bank near Shayama Sadhu Mandir, Ward No_10 of BMC Bishalgarh under WR Sub-Division, Bishalgarh during the year 2025-26_ SH_ Manufacturing and placing of Sand Cement Block for a length of 34.00 Mtr. Group-I.
Special maintenance of 4 Nos. LI Schemes at Chandanmura GP and 1 No. LI Scheme Bordowal 1 at Bordowal GP under W.R Sub-Division, Melaghar during the year 2025-2026_ Remodeling and repairing of UPVC pipeline distribution system.
Shifting of L.I. Scheme at Routhkhala of Bishalgarh Municipal Council _ Re-construction of pump house and other allied works during the year 2025-26.
Special maintenance of LI Schemes at West Nalchar GP, South Nalchar GP and Bagabassa GP under W.R Sub-Division, Melaghar during the year 2025-2026_ Remodeling and repairing of UPVC pipeline distribution system
Periodic mtc of brick lined canal of Noachera Diversion scheme under Nalchar Block _Ch_ 0 to 1500.00 m_during the year 2025-26.
Maintenance of different M.I Schemes under Bishalgarh R.D Block during the year 2025-26. _SH_Mtc. of UPVC distribution line, leakage, GI hydrant post, Sluice valve etc. and other allied works under W.R Sub-Division Bishalgarh.