Loading…
Loading…
275 results • Recent activity
Anti-erosion work of Bijoy river bank near Shayama Sadhu Mandir, Ward No-10 of BMC Bishalgarh under WR Sub-Division, Bishalgarh during the year 2025-26_ SH_ Manufacturing and placing of Sand Cement Block for a length of 34.00 Mtr. Group-II.
Maintenance of different LI and DTW schemes of Jubarajnagar RD Block under Water Resource Sub Division Dharmanagar during the year 2025 26 SH Repairing of pump motor panel board etc
Maintenance of different M.I Schemes under Charilam R.D Block and BMC Bishalgarh during the year 2025-26. _ SH Mtc. of UPVC distribution line, leakage, GI hydrant post, Sluice valve etc. and other allied works under W.R Sub-Division Bishalgarh
FDR Cleaning of Halflong cherra and Dead Juri River from n h of Rakesh paul to n h of Biman Paul Ward no 5 at Radhapur GP of Jubrajnagar RD Block under Water Resource Sub Division Dharmanagar during the year 2025 26 SH Cle
Construction of flood water disposal drain near steel bridge at Sonararbasha in the eastern side at river Juri spanning over land of Lt Upendra Chandra Nath during the year 2025 26 Balance part SH RCC Drain and CC Toe wall Job No TR 09 Major
Improvement of Rowa High School L I Scheme under Panisagar R D Block under Water Resource Sub Division Panisagar North Tripura during the year 2025 26 S H Maintenance of pick up weir