Loading…
Loading…
110 results • Latest
GENERAL-Eviction of Encroachment 2025-26 under Sulthan bathery Roads section
GENERAL-Investigation work- Junction improvement at thottuva, preparing DPR including land acquisition for widening and easing dangerous curves kuravilangad to kuruppanthara road at ch 1.500 to 2.500 km and Menachil -kaduthuruthi road 0.000 to 0.500
installation of road safety sign boards and remarking the road edge lines and centre lines on Changanacherry Wazhoor road
GENERAL Construction of drain at palazhi on pottamal palazhi puthoor madam road between km 4 000 4 050 Construction of drain at palazhi on pottamal palazhi puthoor madam road between km 4 000 4 050 General Civil Work
GENERAL RP 2025 26 Providing BC overlay BM patches and strengthening of damaged portion of Sulthan bathery Cherambadi road km 0 300 to3 000 ch btw km 0 300 to 3 000 General Civil Work 1
GENERAL-Investigation - Thiruvegappura Parallel Bridge-Investigation for the Construction of Thiruvegappura Parallel Bridge and Approach road connecting Kottakkal LAC and Pattambi LAC