Loading…
Loading…
117 results • Recent activity
Construction of CC Lining work reach from 2.625 Km to 2.770 Km and 2.776 Km to 2.896 Km of Total 265 Mtr in main canal of gurha pump canal at gram gurhakalan block naraini distt banda
laying commissioning and painting of ms pipeline 300mm dia reach from 0.00 to 0.1665 Km three pipeline total 499.50 mtr and 630mm dia ms pipeline reach from 0.1665 to 0.2520 Km total 85 mtr in main canal at ramjanki pump canal distt banda lot 1
installation of 01 new barge 15x5.5X1.7 m planking covering painting etc. work and dismantling of 02 old dilapidated barges and dismantling of 04 pump sets from the old barge and installing them on the new barge at Gurha Pump Canal
Dismantling and safe shifting of old pump, motor, panels, capacitor and other associated equipments (From pump No. 01 to 10) at Chaudhary charan singh Dalmau A Pump canal stage 1st, Distt. Raebareli
RENOVATION OF STORE-2 AT WORK OF TUBEWELL DIVISION LUCKNOW INCLUDING ALL MATERIAL LABOUR T AND P AS PER SPECIFICATIONS OF BOQ
RENOVATION OF STORE-1AT WORK OF TUBEWELL DIVISION LUCKNOW INCLUDING ALL MATERIAL LABOUR T and P AS PER SPECIFICATIONS OF BOQ