Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
10,413 live7,194 closing this weekmost from E-IN-C BRANCH - MILITARY ENGINEER SERVICES and PWD - CE AND AS
10,413 results • Latest
Tulsipur Ranej Road
From the VVIP gate within the Maa Pateshwari Temple complex passing by the main temple the gaushala the Maa Kali temple and the hospital up to the main gate access road
Sonar Road
Widening and strengthening of Siltham Ramgarh Kurakala road
Janpad Farkhabad Fatehgarh eshthit Rajkiya Awasiya Coloniyo me varshik vidhut anurakshan ka karya
Jaljalwa Link Road
Ahiranpurwa Link Road
Dhomanhawa Link Road
Bankati to Bhangha access road
Gugauli Khurd
Narayanpur Kauwapur to Pachpakdi Link Road
Bhanghi to Nandmahara access road
Dihwa to Nandmahara Link Road
Various repair work in Govt. Residential Quarter type I and II at Sawai Madhopur
NAYI BASTI ODHARA VIA JALIYASAI TAK ROAD
Kanpur Nagar eshthit Rajkiya Awasiya colony Rawatpur Purani awam nayi DM Compound awam circuit house colony me varshik anurakshan ka karya
Special repair work of Takhtarwa to Balha Link Road.
Special repair work of Katia to Madhwa Jot Link Road.
Widening and Strengthening work of Dandi Naree Majhgawa Road ODR in Distt Gorakhpur in FY 2026-27 With 05 Year Maintenance LOT NO 1 of 1
Construction of Road and CD works including maintenance of five years - L713-Sankhajhara to Nara sahi Road under PMGSY-IV Batch-I for the Package No. OR-17-706 in the District of Keonjhar.
Construction of C C Road and Drain at Abadi Portion of Budaun Bijnor Road to Ughaiti Patti Garvi Link Road Under Special Repair 2026-27
Special repair work of Jigna Badauliya Link Road via Murawandih up to Ahirandih.
Widening and strengthening work on the Kalwari Robertsganj Khaliyari road State Highway 154
PROVN OF WATER FILTRATION SYSTEM AT CH (EC) COMPLEX AND AT II LINES AT ALIPORE KOLKATA
Special repair work of PB Road to Sekhuiya Jyonar Road.
Erection of Pantoon Bridge and Dismantling after Rainey session on Ramganga river Manihar Ghat in Distt Shahjahanpur Fin.Year 2026-27
Construction of C C Road and Drain at Abadi Portion of Bagwala Malpur Tatera Road to Salawatpur Link Road Under Special Repair 2026-27
Construction of C C Road and Drain at Abadi Portion of Buduan Bijnor Road to Ghansoli Link Road Under Special Repair 2026-27
Construction work of 2225 meter outer boundary wall of the campus in 26th Battalion PAC in Gorakhpur Lot NO 1 of 1
Erection of Pantoon Bridge and Dismantling after Rainey session on Bahgul river Nausara Ghat in Distt Shahjahanpur Fin.Year 2026-27
1) PWD road to Chirulei Road OR0908 and 2) L47 MDR Teramile chhak Birikhunti Road OR0964 and 3) Neulapoi Haradaberena Road OR0979 and 4)T2 MDR Sarakhia Road OR09110 _Clubbing Package no OR-09-Main-01/ 2026-27
Special repair work of Jogiya Kala-2 Link Road.
Special repair work of Katra to Bhikhampur Link Road.
SINKING OF MINI DEEP TUBE WELL (150 X 100MM UPVC PIPE, DEPTH 90M) WITH 2HP SUBMERSIBLE PUMP AT PURNAJOYPARA ST BOYS HOSTEL AT DAKSHIN TUISAMA VC UNDER DASDA RD BLOCK 2ND CALL.
Special repair work of Srinagar to Hariharpur Link Road.
Various Repair work in SR type Residential Quarter at Sawai Madhopur
REPAIR AND MAINTENANCE OF CERTAIN ROOF AND PARAPET WALLS OF RS AREA AT NAVY NAGAR UNDER AGE BR-II , GE (NW) NAVY NAGAR, COLABA, MUMBAI
Construction work of four Type-4 pooled residences located in the DM Colony of District Bulandshahr
SPECIAL REPAIR TO CHAIN LINK FENCING AT CERTAIN LOCATIONS AT LICHUBARI UNDER GE JORHAT
Construction of C C Road and Drain at Abadi Portion of Dhel to Songurhi Link Road Under Special Repair 2026-27
SINKING OF MINI DEEP TUBE WELL (150 X 100MM UPVC PIPE, DEPTH 90M) WITH 2HP SUBMERSIBLE PUMP AT ANANDABAZAR BADP ST BOYS HOSTEL (STATE) AT ANANDASAGAR VC UNDER DASDA RD BLOCK 2ND CALL.
Construction of CC Road at Km.1(400-700) on Derapur Mangalpur Road to Khajuri Link Road (VR)
ADDN / ALTN / IMPROVEMENT IN TACDE BUILDING AT AF STN GWALIOR
Special Repair of Vijaipurwa to Bhaura via Gulabpurwa Link Road (V.R.).
SINKING OF MINI DEEP TUBE WELL (150 X 100MM UPVC PIPE, DEPTH 90M) WITH 2HP SUBMERSIBLE PUMP AT DURGARAMPARA ST BOYS HOSTEL AT UTTAR DASDA VC UNDER DASDA RD BLOCK 2ND CALL.
Construction of C C Road and Drain at Abadi Portion of Sahaswan Dakarapukhta Road to Bhagtanagla Bajpur Link Road Under Special Repair 2026-27
SPL REPAIR WK OF BLDG NO P-179 (OR MD ACCN TAGORE LINE) OF ARTY BDE CAMP
SINKING OF MINI DEEP TUBE WELL (150 X 100MM UPVC PIPE, DEPTH 90M) WITH 2HP SUBMERSIBLE PUMP AT ANANDABAZAR BADP ST BOYS HOSTEL (TTAADC) AT ANANDASAGAR VC UNDER DASDA RD BLOCK 2ND CALL
Construction of C C Road and Drain at Abadi Portion of Kariyamai to Sorha Link Road Under Special Repair 2026-27
SINKING OF MINI DEEP TUBE WELL (150 X 100MM UPVC PIPE, DEPTH 90M) WITH 2HP SUBMERSIBLE PUMP AT DURGARAMPARA ST GIRLS HOSTEL AT UTTAR DASDA VC UNDER DASDA RD BLOCK 2ND CALL.