Loading…
Loading…
9,285 results • Latest
Patch repair work on SH MDR ODR Roads under Assistant Engineer 2
Strengthening Approch road and Bankwork to K.T.Weir at Machnur, Ta. Mangalwedha, Dist. Solapur
WARD NO 3 JYOTI NAGAR ME VINAYAK MEDICAL STORE SE MEERA TIWARI KE MAKAN TAK INTERLOCKING ROAD AND NALI NIRMAN KARYA
CC work from Shri Gurudayal house to Neelam Baghel house in Nagla Lallu, Tundla
Patch repair work on Village Roads under Assistant Engineer III
WARD NO 13 SANDI ROAD ANKH ASPTAL SE CHOTU GUPTA KE MAKAN SE CHOTE MAHARAJ KE MAKAN TAK INTERLOCKING AND NALI NIRMAN KARYA
Patch repair work on various roads within the jurisdiction of Assistant Engineer IV
Patch repair work on SH MDR ODR Roads under Assistant Engineer 4
CAINAL ROAD PAR ADM AWASH KE SAMNE VENDING ZONE KA NIRMAN KARYA
CC road construction from Rajendra house towards Mukesh house in Majra Sadasukh of Gram Panchayat Gundau.
NAGETA ROAD PAR VENDING ZONE KA NIRMAN KARYA
CC work from Ambedkar Park to Virendra Singh temple in Kheria Kala, Vikas Khand Narkhi.
CC work in village Sikhara from the Sikhara-Alhadadpur road towards Sushil Guru house.
JAIL RAOD PAR KOYAL BAG CALONY KE SAMNE VENDING ZONE KA NIRMAN KARYA
CC road and drain construction work from Sanjay house to the paved road in Khemkaranpur hamlet of Gram Panchayat Laturra
CC work from Nathuram house in Hiran Gaon village towards the Hanuman Temple
CAINAL ROAD PAR KOYAL BAG CALONY KE SAMNE VENDING ZONE KA NIRMAN KARYA
SANDILA UNNAO ROAD SE GRAM BEHSARIYA BARATI KE MAKAN SE SHIV SHANKAR KE MAKAN TAK INTERLOCKING NIRMAN KARY
CAINAL ROAD PAR SICHAI VIBHAG KE SAMNE SE NALKUP VIBHAG KE SAMNE TAK VENDING ZONE KA NIRMAN KARYA
CC work from the main road at Majra Chandika of Gram Panchayat Baghai towards Pradeep Kumar house
Bheempura Belauli to Sodhanpur road via Amaven
Kidiharapur Fattehpur road to Yadav Nagar road
Seeyar Pashuhari road to Rausada road
Providing Laying Jointing and commissioning of various size HDPE DI pipes at various WSS under jurisdiction Division Tonk (ARC)
Constructions and Commissioning of 125mm diameter New Handpump by DTH/Rotary/Combination system under jurisdiction of Division Tonk under Annual Rate Contract
Construction of Additional Record Room at RW Division office Deogarh_building
Construction Of 13 Nos Toilet in Anganwari Center Block Kuchai Rajnagar, Chandil Nimdih under Saraikela Kharsawan District under D W S Division Saraikela for the year 2026 27
Rejuvenation of Village Pond for Enhanced Water Security in Buxora jaspur block
Rejuvenation of Village Pond for Enhanced Water Security in Manorathpur-1 Jaspur block
Construction Work of one nos Toilet and Leach Pit at different school in Saraikela Kharsawan district under DWSD Seraikella for the year 2026 27
Rejuvenation of Village Pond for Enhanced Water Security in Raypur Pattilekhraj Jaspur block
Drilling of bore hole of 150 mm dia, supply and installation including commissioning and testing of tube well at rural and urban scheme urban scheme under jurisdiction of Division Malpura under Annual rate contract
Construction of one classroom, one library room, and a boundary wall at Government Primary School Ratanfarm No. 1 (Sitarganj) an Utkrisht Vidyalaya (Model School).
Construction Work of double unit Toilet and Leach Pit at different school in Saraikela Kharsawan district under DWSD Seraikella for the year 2026 27
SPL REPAIR OF INTERNAL ELECTRICAL WIRING AT NAI KOLKATA, PROVISION OF MULTIPURPOSE SHED NEAR OTM-24 AT 2 CBPO ALONGWITH CERTAIN MINOR WORK AT NAI KOLKATA UNDER GE (N) KOLKATA
SPL REPAIR TO BLDG NO T-164 AND T-165 (CLOTHING STORE AND QM STORE) AT ESD KANKINARA UNDER GE (N) KOLKATA
Carrying out borehole investigations for Chainage Km 84 to Km 109 (25 km) and geotechnical investigations using Electrical Resistivity Tomography (ERT) for Chainage Km 110 to Km 135 (25 km) for preparing the Design, Estimates and Detailed Project Rep
Carrying out borehole drilling (boreholes) from Km 1 to Km 29 (total length 29 km) for conducting surveys and investigations for preparing the Design, Estimates, and Detailed Project Report (DPR) for the project to supply Krishna River water to drou
Carrying out borehole drilling (boreholes) from Km 29 to Km 58 (total length 29 km) for conducting surveys and investigations for preparing the Design, Estimates, and Detailed Project Report (DPR) for the project to supply Krishna River water to dro
Carrying out borehole drilling (boreholes) from Km 58 to Km 84 (total length 26 km) for conducting surveys and investigations for preparing the Design, Estimates, and Detailed Project Report (DPR) for the project to supply Krishna River water to dro
Necessary repair work under Construction of Road under DMFT Scheme in Distt. Baran Package No. RJ-04-DMFT/2021-22/31 under the contractor guarantee period
Necessary repair work under Construction of Roads under DMFT Scheme in Distt. Baran Package No. RJ-04-DMFT/2021-22/27 under contractor guarantee period
Necessary repair work on Anta Siswali Road Chainage 14/0 to 38/0 (SH-51A) under contractor guarantee period
Sensor Guarantee Period under Construction of Road under PMGSY Package No. RJ-04-/P3/2019/03 Necessary repair work on Sindhpuri to Badgaon Pokhra Bawri upto SH37A and Kachri to Batawdi Palsawa
Necessary repair work on Anta Sangod Road Km. 38/0 to 60/0 (SH-51A) under contractor guarantee period
Link road Bhatwara to Rakaspuriya Km. Road renovation work from 3/570 to 5/450
Necessary repair work under Construction of Rehabilitation and Upgradation of MDR ODR and VR (Non Patchable) Roads under RIDF-27 in Distt. Baran Package No RJ-04-01/RIDF-27/NP/2021-22 under sensor guarantee period