Setting up of 2.5 Mtpa Moonidih Coking Coal Washery, BCCL on BOM Concept
Preparation of Rescue First aid set up for Inter Sub Area First Aid Rescue competition 2026-27 at Bhallar Township under Wani North Area
Repair and Replacement of LAN Infrastructure along with Accessories at Various Locations .
A. Repairing, maintenance and wiring and re installation on present statutory steel boards. B. Painting and writing of safety slogans and safety instruction on the big size boulder at along the haul road, coal stock yard and at different places in mi
Diversion (Dismantling 07 km, laying and jointing 10 km) of MS pipe from 30 no. coal stock to RVR belt and Dismantling (08 km), transporting, laying and jointing of 18 km ( 04 Range of 4.5 km each) of MS pipe along the east/west side of conveyorr
Repairing of cold forged hydraulic thread rolling machine for threading of roof bolt at Porascole West Colliery
Dismantling, transporting and shifting of lose disposable scrap from 1 mono stations of J.K.Ropeways to scrap yard at camp site station of J.K.Ropeways
Repairing of Track frame Assly along with Track Tensioner and changing of damaged idler roller and Track roller and repairing of Trunion and trunion cap of dozers Running at Chhal mine of Raigarh area.
Repairing of Radiator, Transmission and Hydraulic Cooler of BD 355 and BD 155 Dozers Grader and Radiator of Grader and Crane of different project of Raigarh Area
Estimate for (A). Installation of 11KV on load isolator in main incoming 11KV O/ H and (B). Installation of 11KV, 630A, GOAB Horizontal type at different locations of GVP Ph- II OCP, Kathara Area
Providing and fixing of electrical equiments for smooth power supply to DDU, Store, filter-bed , main sub-station, P.O Office, Hospital etc of GVP Phase-II OCP, Kathara Area
Installation of 1200 mm conveyor belt structure at 4 Dip from 4L to 15L of MIC, Jhanjra Project Colliery.
Transportation, Installation, commissioning n trial run including necessary fabrication jobs (including civil works) of one 1000mm width ,200kW,6.6kV PVC Belt Conveyor for a length of 107m and extension of 540m length(12 times shifting) along Trunk R
Repairing and rewinding of 1 number 37 KW, 550 V, 2950 RPM C and G make motor CC No. J 15 and 1 number 90 KW, 550 V, 1480 RPM Marathon make motor CC No. 730 of MIC, Jhanjra Project Colliery.
Repairing of 06 Nos Upper Rollers Periphery of TATA Ex-1200
Transportation, installation, commissioning, necessary fabrication and trial run including civil work of one number 1200 mm width 2 x 150 KW, 6.6 KV belt conveyor for a total length of 260 mtr from 7L to 1R (Panel 5) to 7L to 8R in R V seam of MIC, J
Partial shifting of two numbers of 6.6 kV overhead lines using AB cable at MIC, JPC.
Strengthening of 1000mm wide 80L belt conveyors in LHCM-1 section of R VIIA seam at 3n4 Incline, J.P.Colly
Transportation, installation, necessary fabrication, commissioning and trail run of one no. 1000 mm width, 1X110 kw, 550v drive belt conveyor in Panel F1( R VII SEAM) at 3n4 incline ,JPC
Strengthening of 1000mm wide -8D belt conveyor in LHCM-2 section of R VII seam at 3n4 Incline, J.P.Colly.
Strengthening of 1200mm wide 2nd belt conveyor in R VIIA seam at 3n4 Incline, J.P.Colly
Transportation and installation of 4 inch diameter pipes at LHCM 1 spray pipeline in R VIIA seam of 3 and 4 Incline, Jhanjra Project Colliery
Fabrication of one number 2 x 150 KW complete drive head frame, gear box frame, motor frame and loop take up frame for 1200 mm belt conveyor structure in Panel T6 at MIC, under Jhanjra Project Colliery.
Repairing of one number pressure drum and one number fixed drum, PCC No. 119 size 400 mm diameter x 1600 mm long and PCC No. 120 size 800 mm diameter x 1400 mm long, respectively, of trunk belt conveyor in MIC, Jhanjra Project Colliery.
Repairing of making and fitting of new ladder, Railings and repairing of platform for EKG-521 and 522 Shovel
Repairing of both side final drive assly of Dozer D355 Sl. No. 11840 of ABOCP.
Repair and installation of track roller (repair and fitment) 07 nos. of shovel Tata Ex-1200 SI No. 2057 Shovel of ABOCP Mines
Installation of two new 350 m head pump motor sets at 28L/34D and 31L/34D for dewatering of RVI seam of MIC, JPC.
Strengthening of a belt conveyor by fabrication of fixed unit of loop take up and installation of gear coupling in R VIIA seam at LHCM 1 section at 3 and 4 Incline, Jhanjra Project Colliery
Strengthening of 1000mm wide 11(2) and 11(3) belt conveyors in LHCM-1 section of R-VIIA seam at 3n4 Incline, J.P.Colly.
Transportation of 759 mtr. trackline (Total rail length 1518 mtr.) materials from surface and fitting them at site in panel 12, LHCM-1 in R-VIIA seam at 3n4 Incline JPC.
Transportation, installation and necessary fabrication jobs of one 90 mtr head complete turbine pump motor set at 87L sump in R VIIA seam at 3 and 4 Incline Unit, Jhanjra Project Colliery
transportation, installation, necessary fabrication, commissioning trial run of one no. 1000mm width, 2X150kW, 6.6kV, drive belt conveyor in R-VIIA seam, Panel 12 at 3N4 Incline, J.P.Colly
Installation of 4 inch diameter spray pipeline with manifold for development of Panel 12 in R VIIA seam at LHCM 1 at 3 and 4 Incline, JPC.
Installation of one number 6.6 kV VCB, two numbers 550 V ACB at 58L and 71L substations, one number 315 kVA 6.6 kV/550 V TSU at site in R VIIA seam and 250 mtr 95 sq mm 6.6 kV grade cable between VCB at 58L substation and 71L substation for supplying
Transportation and installation of 4 inch diameter pipes for establishment of delivery pipeline of a pump in R VII seam of 3 and 4 Incline, Jhanjra Project Colliery
Repairing of one No. sprocket (RHS) for TATA Hitachi Ex-1200 Hyd Shovel Sl No. 2057 at ABOCP Mines Block-II Area
Fabrication of 400 Nos of Bottom Roller for 1000mm belt conveyor circuit with Bearing 6206ZZ at Kurja UG Mine
Computer Paper (V3) Conforming to IS 12766 (In Packet) (Q4)
Switch Mode Power Supply (SMPS) , Type USP-225-24, Geiger-Mü Ller Detector Set (without GM Tube) , Version V2— Complete Detector Mounting Assembly, Geiger-Mü Ller Tube— High-performance Geiger-Mü Ller Counter For Measurement Of Beta-ray Attenuation
Facility Management Services - LumpSum Based - Upkeeping of SAM office and GVTC under HLSA of Chandrapur Area for a period of 2 years Retender; Upkeeping of SAM office and GVTC under HLSA of Chandrapur Area for a period of 2 years Retender; Consumabl..
Custom Bid for Services - Supply and installation of running earth conductor wires and guarding wires lightning conductors with proper earthing and MCBs with proper enclosures DRC UG RSA Chandrapur Area WCL Work as per scope of work schedule of wor.. Similar Category Operation And Maintenance Of Electro-Mechanical Installations
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Electrical System or Installation; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Substation; Service Provider
SPRING TRACK FOR TATA 370 HYDRAULIC EXCV PART NO TB03831
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Electrical System or Installation; Service Provider