Loading…
Loading…
21,131 results • Latest
repairing/maintenance of the OH Line of the Loading Section along with OHE Isolator Operation at the time of Loading/Unloading of Coal Wagons under the Rajrappa Washery Project for a period of 365 days.
Supplying and Fixing of Lightning Arrestors over Pit Office and Picket, and Erection of Lightning Arrestors at View Point and Security Checkpost Room at Tetariakhar OCP under Rajhara Area. (Monsoon action plan 2026)
Comprehensive Annual Maintenance Contract (CAMC) of 15 Nos. Cameras along with Allied Accessories installed at different locations of Rajrappa Area for 01 year
Drilling of 2 nos. NX size pilot bore hole from surface to below Kalimati coal seam and reaming of 1 One No. of Bore hole 10inch dia for installation of submersible pump to provide the drinking water of Sialkanali villagers under south gram panchayat
Complete repairing and overhauling of 310 HP and 198 HP Kirloskar Oil Engine make installed at Tetariakhar OCP under Rajhara Area.
Drilling of 2 nos. NX size Non-coring pilot Bore holes and reaming of (1) One No. of Bore 14inch from surface to Kalimati Bottom Seam up to 145.00 meter depth for installation of submersible pump at Kapasara OCP.