Loading…
Loading…
247 results • Recent activity
SAMSUNG Ultra HD (3840 x 2160) LCD (Liquid Crystal Display), SAMSUNG Ultra HD (3840 x 2160) LCD (Liquid Crystal Display) Professional Large Format Display
PTZ Dome Camera 30x or better with mount bracket Power supply and Media Converter etc, 2 Megapixel Fixed Day Night IP Camera or better with mount bracket Power supply POE Injector and Media Conveter etc., Network Video Recording Server with 45 days recording backup Including VMS Software and required Licence and Workstation, POE Switch 24 port Giga Ethernet 4 SFP port, POE Switch 8 port Giga Ethernet 2 SFP port, SFP Module 10G, 8 port Unmanaged Switch, Indoor Rack 9U with 24 port Jack pannel fully loaded, Outdoor Rack 6U, 6 Core OFC armored cable, SC LC OFC Patch cord 3 Mtr, 24 Port LIU Loaded, 12 Port LIU Loaded, HDPE PIPE 32MM, PVC PIPE 25 MM, STP CAT 6A Cable 305 Mtr, UTP CAT 6A Cable 305 Mtr, UTP CAT 6A Patch Cord 2 mtr, UTP CAT 6A Patch Cord 1 mtr, I O CAT 6A with Face plate and backbox, STP RJ 45 Connector, Power Cable 1.5 Sqmm 3core, Armoured Power Cable 4 Sqmm 3core, Electrical Junction Box, Surge Protector, Lighting Arrester with Chemical earthing, 3 Mtr Camera Pole with self supported and earthing, 55 inch LED Display including HDMI Cable of required length, Video Extender for Display, Video Splitter for Display, Installation Integration Testing and Commission of the all equipments of the CCTV Survillance project including warranty of one year, Post Warranty Comprehensive AMC of all itmes i.e. active and passive used in the CCTV survillance project of this location for three 03 years, PTZ Dome Camera 30x or better, with mount bracket Power supply and Media Converter etc., 2 Megapixel Fixed Day Night IP Camera or better, with mount bracket, Power supply POE Injector and Media Conveter etc., Outdoor Acess Point RF Master, Outdoor Acess Point RF Slave, 01 KVA online UPS with 30minutes backup, 21 Mtr tower with all accessories including lighting arrester with earthing, Installation, Integration, Testing and Commission of the all equipments of the CCTV Survillance project including warranty of one year, Post Warranty Comprehensive AMC of all itmes i.e. active and passive used in the CCTV survillance project of this location for three years, PTZ Dome Camera 30x or better, with mount bracket, Network Video Recording Server with 45 days recording backup Including VMS Software and required Licence and Workstation., Indoor Rack 6U with 24 port Jack pannel fully loaded, Lighting Arrester with Chemical earthing., 3 Mtr Camera Pole with self supported and earthing., 10 KVA online UPS with 2hours backup, HDPE PIPE 32 MM, Installation, Integration, Testing and Commission of the all equipments of the CCTV Survillance project including warranty of one year., Network Video Recording Server with 45 days recording backup Including VMS Software and required Licence s and Workstation., Post Warranty Comprehensive AMC of all itmes used in the CCTV survillance project of this location for three years, UTP CAT 6A Cable, Installation, Integration, Testing and Commission of all components of LAN including warranty of one year. Bid Details 2/118
Operation and Maintenance Of Electrical Systems/Electrical Installations - Complete System
Steel Filing Cabinets for General Office Purpose (V2) as per IS 3313 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7034844 Dated : 23-12-2025 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Fleet Management Service - Tractor Trailer Unit; Tractor+Trailers; Service Provider; 3
Annual Maintenance Service - Desktops, Laptops and Peripherals - UPS (Online 10 KVA); other, Laptops and Peripherals - UPS (Online 6 KVA); APC, Laptops and Peripherals - UPS (Online 3 KVA); Uniline