Loading…
Loading…
136 results • Recent activity
SUPPLY, FABRICATION, SURFACE PREPARATION, PAINTING AND TRANSPORTATION OF BRIDGE COMPONENTS TO TEESTA RIVER BANK AT TARKHOLA, DISTRICT KALINGPONG, WEST BENGAL
CARRYING OUT HOT TAPPING WORKS IN CONNECTION WITH COMPOSITE WORKS FPR REPLACEMENT OF 03NOS OFF GAS COMPRESSORS,06 NOS REGENERATION GAS COMPRESSORS AND INSTALLATION OF 01 CBD VESSEL, ONE KNOCK OUT DRUM (KOD) AT ONGC URAN PLANT
EXECUTION OF MASONRY WORKS, CONCRETE WORK, REINFORCEMENT WORK, DRILLING HOLES, WALL CUTTING WORKS, FINISHING WORK (PLASTERING, PAINTING, FALSE CEILING WORK), EXPANSION JOINT WORK FOR 8 ELEVATED STATIONS
CARRYING OUT VARIOUS INSTRUMENTATION WORKS AS PER STANDARD SPECIFICATION BY PROVIDING ALL REQUIRED MATERIALS IN CONNECTION WITH COMPOSITE WORK FOR UTILITIES AND OFFSITES PART B FOR PANIPAT REFINERY EXPANSION PROJECT (P25) AT PANIPAT REFINERY, HARYANA
DESIGN, MANUFACTURING, INSPECTION, TESTING, SUPPLY, DELIVERY AND INSTALLATION OF 1 NO.LIFT WITH V3F CONTROL and A.R.D. FOR 6 PASSENGERS CAPACITY IN CONNECTION WITH RENEWING OF 9.0MG CAPACITY CENTURY OLD OVERHEAD BALANCING STEEL RESERVOIR
CARRYING OUT VARIOUS NON DESTRUCTIVE TESTING (NDT)WORKS AS PER STANDARD SPECIFICATION BY PROVIDING ALL REQUIRED MATERIALS AND RESOURCES IN CONNECTION WITH COMPOSITE WORK FOR UNITS (AVU, SULPHUR BLOC,PRU AND COMMON MUG COMPRESSOR UNIT) (PART A,BandC)