Loading…
Loading…
587 results • Recent activity
Removal of deposited earth of canal bed from ch. 18 to ch 44 of LBMC of Nachan Kanar irrigation scheme of Durgapur Section No. II under Damodar Headworks Sub-Division in PS FaridpurBlockDurgapur Faridpur, Dist Paschim Bardman
Removal of Silt near PHE pump house at Nandin in Block and P.S. Barjora, Dist. Bankura under Durgapur Section No. I of Damodar Headworks Sub Division
Construction of R.C.C Box Culvert over Nalikhal near Dewanbheri Masjid Tala under Gopal Nagar G.P in P.S and Block- Singur Dist. Hooghly
Clearing and removing of water hyacinth including debris of Ghungir Khal for a length of 2.80 Km from Ch. 3.8 Km to Ch. 5.6 Km and Ch. 6.8 Km to 7.8 Km in Baidyabaity Municipality, PS-Serampore Dist Hooghly, CISD
Construction of R.C.C Bridge over river South Saraswati near Nasibpur Railway Station at Nasibpur GP Singur Block, District - Hooghly
One time clearing and removing water hyacinth from River Cut kunti channel in between Panchanatala Bridge and Bagdanga Sluice (for a length of 320.00 M) within Block Singur Dist. Hooghly of Lower Damodar Irrigation Division.