Loading…
Loading…
72 results • Recent activity
Construction of guard wall in between RD 5410m to 5490m and 4650m to 4900m of Rengalbeda disty. of GRMC under DID for the year 2024-25 under critical lumps.
Construction of guard wall in between RD 1100m to 1160m of Tinkibir Minor of GRMC under DID for the year 2024-25 under critical lumps.
Construction of bed with slope lining from RD 1400m.to 1800m. of Tabda Minor of Bijabereni disty under GRMC for the year 2024-25 under critical lumps.
Construction of Guardwall with bed lining from RD 1260m to 1490m of Ratakhandi Sub Minor for the year 2024-25 under critical lumps.
Construction of bed with slope lining from RD 3870m.to 3980m. of GRMC under GIP for the year 2024-25 under critical lumps.
Constuction of VR bridge at RD 763m and at RD 1068m with guardwall of Badadangaghat Sub-Minor and desilting and bank raising of Badadangaghat and Gujahuli S/M of GLMC. for the year 2024-25 under critical lumps.