Loading…
Loading…
7,686 results • Latest
FILTER ELEMENTS FOR TURBINE OIL PURIFICATION SYSTEM FILTER
Gasket Sheet-IS: 11149 (Q3)
Complete Safety Relief Valve (SRV) Flanged ANSI B16.5, 150# RF X 150# RF Required Flow- 1800 Kg./hour, Complete Safety Relief Valve (SRV) Flanged ANSI B16.5, 150# RF X 150# RF Reduired Flow- 700 Kg./Hour
Randox Specific Protein Control L-3
Customized AMC/CMC for Pre-owned Products - AMC FOR ICP-OES MODEL JY2000(2); ICP-OES; Annual Maintenance Contract (AMC); Six-Monthly; Yes
High-Vacuum Gas Sorption Analyser (HV-GSA)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Seller premise; Vehicles, Cummins Engine; Service Provider
Toner Cartridges/Ink Cartridges/Consumablesfor Printers (Q2) (PACOnly)
Stacked Tip Nozzles (Q3)
Custom Bid for Services - Hiring of an ambulance at IREL Chavara/mining site Similar Category Hiring of Air Ambulance Service (Long Term Services)
Facility Management Services - LumpSum Based - Industrial; O&M of Mechanical Work; Consumables to be provided by service provider (inclusive in contract cost)
EBM PAPST make Centrifugal Radial Fan - Model: R2E 085- AA01-05 - as per enclosed specifications.
Supply of 40NB Pneumatic actuated Butterfly valve with SS 304 EPDM Disc, Supply of 40NB Pneumatic actuated Butterfly valve with SS 304 PTFE Disc, Supply of 50NB Pneumatic actuated Butterfly valve with SS 304 EPDM Disc, Supply of 50NB Pneumatic actuated Butterfly valve with SS 304 PTFE Disc, Supply of 50NB Pneumatic actuated Diaphragm valve with Ebonite Rubber lined Disc, Supply of 50NB Manual Gate valve SS304L, Supply of 80NB Manual Gate valve SS304L, Supply of 50NB Manual Gear Operated Butterfly valve, Supply of 80NB Manual Gear Operated Butterfly valve, Supply of 100NB Manual Gear Operated Butterfly valve, Supply of 125NB Manual Gear Operated Butterfly valve, Supply of 150NB Manual Gear Operated Butterfly valve, Supply of 200NB Manual Gear Operated Butterfly valve, Supply of 250NB Manual Gear Operated Butterfly valve, Supply of 50NB Non Return Valve, Supply of 80NB Non Return Valve, Supply of 100NB Non Return Valve, Supply of 125NB Non Return Valve, Supply of 150NB Non Return Valve, Supply of 200NB Non Return Valve, Supply of 250NB Non Return Valve, Supply of 15NB Manual Gate valve, Supply of 25NB Manual Gate valve, Supply of 50NB Manual Gate valve, Supply of 80NB Manual Gate valve, Supply of 100NB Manual Gate valve, Supply of 150NB Manual Gate valve, Supply of 200NB Manual Gate valve, Supply of 250NB Manual Gate valve, Supply of 300NB Manual Gate valve
Valve Regulated Lead Acid (VRLA) Batteries as per TEC Specification (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Online Conductivity Measuring System Consists Of Range: 0 To 10µ S/cm, Online Conductivity Measuring System Consists Of Range: 0 To 100µ S/cm, Online Conductivity Measuring System Consists Of Range: 0 To 5µ S/cm
Fixed Computer Workstation (Q2)
Doped Fiber for Lasers and Amplifiers
Microwave Plasma Optical Emission Spectrometer
MULTICHANNEL AMPLIFIERS TYPE-1 FOR, AUDIO SYSTEM. SPECIFICATIONS GIVEN, IN THE ANNEXURE
Providing Services for Reflector surface refurbishment work of any One Antenna in the radius of 30 Km from GMRT Lab Building of GMRT Khodad, Near Narayangaon, Tal. Junnar, Dist. Pune 410504
Structural steel protective coating work on any two GMRT Antennas at GMRT, Khodad, Near Narayangaon, Tal. Junnar, Dist. Pune 410504
Layer 3 ethernet switch
BLOOD RNA EXTRACTION KIT
Supply, Installation and commissioning of Xtralis VESDA - E VEP with LEDs, Model: VEP-A00-P, Model: VEP-A00-1P
Hot redundant plc based system
Area Gamma Monitor
Hand Held Metal Detector as per MHA QR, Supply, safe delivery and warranty of CCTV Tester used for checking of both Analog and IP Cameras
Digital Storage Oscilloscope (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6971154 Dated : 15-12-2025 Bid Document 1/9 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 40 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : The President of India (Acting through the Regional Director, Purchase and stores) Directorate of Purchase and Stores, Department of Atomic Energy, Madras Regional Purchase Unit, DAE Nodal Facility Centre, Dr. Rajendra Prasad Road, Pallavaram, Chennai- 600 043 (.)
Contaminationmonitor (Q3)
Antiwear Hydraulic Oil Heavy Duty (V4) asper IS10522 (Q2) (PACOnly)
Rust Remover Solution (Q3)
Revolving Chair (V5) (Q2)
Toner Cartridges/Ink Cartridges/Consumablesfor Printers (Q2) (PACOnly)
Aluminum Alloy Struts and Accessories
EDS detector for CrossBeam340 FESEM, 51N1307 as per specification
Composite Er Yb Glass and Co Spine crystal
Pyroelectric IR detectors with silicon window
Liquid Argon in Tanker
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Thermal Insulation of Piping and equipments; Service Provider
Moisture sensor for lube oil system of Main turbine
NIM based High Voltage Power supply
Safe supply delivery of Finder make relay comprise of coil voltage 48VDC with 4 set of Common, Norma
Lattice Boltzmann CFD Tool for Pollutant Simulations
Plain Copier Paper (V3) ISI Marked to IS 14490 (Q4) (3 (3 ))
Single Use Sterile Rubber Surgical Gloves Conformingto IS13422 (Q2)
Powder-Liquid Acid-Base Dental Cements Conformingto IS/ISO9917 (Part1) (Q3)