Loading…
Loading…
7,689 results • Latest
Electric Pipe Freezing Unit with Closed Refrigerant Circuit
One set of resonant circuit re-tuning system alongwith capacitors detailed specfication as per attac
Custom Bid for Services - Installation of 11MW Plate Heat Exchanger at ASB Building, Vizag Similar Category Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2)
Industrial Cooling Fan (Man Coolers) (V2) Conforming To IS 6272 (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Contamination monitor (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Digital Time Interval Meter as per attached technical specifications
M/s WIKA make Float for Magnetic Level Gauge as per attached technical specificaitons
12V-150AH SMF Bag Plate Lead Acid Battery
Low Sulphur Heavy Stock (LSHS- Premium Grade having maximum Pour point temperature 27 Deg. C)
BIPOLAR ANALOG ISOLATION AMPLIFIER MODULE
Color Laserjet multi-function machine printer as per attached specifications
PRESSURE TRANSMITTER as per attached annexure
Size in MM - 25 x 25 x 3, Size in MM - 40 x 40x5, Size in MM - 50x50x6, Size in MM - 75x75x8, Size in MM - 75x40x4.5, Size in MM - 100x50x5, Size in MM - 125x65x5.5, Size in MM - 150x75x6
Phytohemagglutinin P., Human IL-2 Protein, TMBIM6 antagonist-1, Mito-TEMPO, Visomitin, Bax inhibitor peptide V5, Protease Inhibitor Cocktail, Pifithrin alpha hydrobromide, Digitonin
TMP controller unit for existing Pfeiffer TMU521 pumping station as per attached annexure, Scroll backing pump as per attached annexure
Magnetic Permeability Meter
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Electrical System or Installation; Service Provider
Operation And Maintenance Of Other Machines And Plants - Job contract for assisting in production activities at REEP
Industrial Siren/Electrical Siren (Q3) MSE Relaxation for Turnover Yes | Complete Startup Relaxation for Turnover Yes | Complete
Facility Management Services - LumpSum Based - Residential; Daily Collection and Disposal of garbages in housing colony; Consumables to be provided by service provider (inclusive in contract cost)
8-hydroxy 2 deoxyguanosine ELISA Kit
Facility Management Services - LumpSum Based - Up- keeping Works of Main plant buildings Zone - I areas and miscellaneous Infrastructure buildings & surrounding areas in Kaiga Generating Station 3and4; Up-keeping Works of Main plant buildings Zone - I..
Repair and Overhauling Service - supply & Installation of Mobile Storage Compactor; Kompactor; Yes; Buyer Premises
Operation And Maintenance Of Other Machines And Plants - Assistance in operation of Pickling and Cleaning of various Zircaloy products
Mechanical Seals for Jacking oil Pumps
Circuit Breakers with Integral Overcurrent Protection (RCBO) as per IS 12640 (Part 2) IEC 61009 - 1 (Q3), MCB - Miniature Circuit - Breakers for A.C. Operation as per IS/IEC 60898 (Part 1) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Customized AMC/CMC for Pre-owned Products - KIRLOSKAR CHILLER MODEL - PEH 100 (TR 550); KIRLOSKAR; Annual Maintenance Contract (AMC); Quarterly; No
Facility Management Services - LumpSum Based - Industrial; Housekeeping; Consumables to be provided by service provider (inclusive in contract cost)
Plain Copier Paper (V3) ISI Marked to IS 14490 (Q4) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Television (V3) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
24 CHANNEL PROCESS SCANNER 230 V AC INPUT RS485 OUTPUT AS PER ANNEXURE
INDUSTRIAL COMPRESSED OXYGEN GAS GRADE II AS PER IS309 IN NFC OR PARTYS CYLINDERS, Valve spindle replacement, Total valve replacement, Cylinder cap valve guard replacement, Gland nut replacement, Neck ring replacement, Oil trace removable, Painting for cylinder, Valve fittings, Hydrostatic testing
PET- CT 64 Slice Scanning System (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Spiral Wound Metallic Gasket (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Item No. 1, Item No. 2, Item No. 3, Item No. 4, Item No. 5, Item No. 6, Item No. 7
Fiber Optic Dual Probe(Probe length 1.5m) as per item 1 of attached Technical Specification, Fiber Optic Dual Probe (Probe length 0.5m) as per item 2 of attached Technical Specification