Loading…
Loading…
7,658 results • Latest
Flame Photometer (Q3)
In-flange ACCTs (ID= 96 mm, Pipe OD= 102 mm; Mating flange: 150 CF; H(axial) = 40 mm) .
SS304 Construction and Valves as per the technical specification attached
Pre monsoon works 2026 at Office Premises at TIFR, Colaba
Refurbishment of existing temporary structure at Pelletron 2nd and 5th floor in TIFR, Mumbai
PVC Insulated Unsheathed Cablewith Flexible Conductor ISI Marked To IS694 (Q2)
INDCON MAKE FILTER ELEMENT FOR DRYER PRE FILTER AFTER FILTER ASSEMBLY AS PER INDCON DRG
Application-Nickel Metal Hydride Conforming To IS16048 (Part2) (Q3)
Equipment for C&SM: Cover meter
High End Desktop Computer (Q2)
Stainless steel pull-outs(Dimension LengthX Breadth XHeight- 19mm X 4mm X 8.95mm (Material - SS 304)
Entry and Mid Level Desktop Computer (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Repair works at intake well intermediate pumping station at
Facility Management Services - LumpSum Based - Industrial; Supply, fabrication and erection of process water header line in MSP as per scope of work; Consumables to be provided by service provider (inclusive in contract cost)
Ultra Pure(5.5 Grade) Hydrogen Gas with 47 Ltrs W. C. carbon steel cylinders with valve guard
Precision Height Gauge (Q3)
Processing board for thermal Camera of Laser Hyperthermia System Model No: InS-MSHT-TH-08-04, Protective breathable cotton cover with front zips for Hyperthermia System Model No: InS-MSHT-TH-08, Laser Protective Viewing Panel for Hyperthermia System Model No: InS- MSHT-TH-08-04
Caustic Soda Lye
Dipper system for film deposition and surface potential meter for Langmuir-Blodgett setup
Beamline components for accelerator facility
Multipara Monitor - Low End (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6564590 Dated : 22-08-2025 Bid Document 1/10, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 70000 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 40 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Director ACTREC Tata Memorial Centre - Advanced Centre For Treatment, Research And Education In Cancer (actrec), Department 2/10 of Atomic Energy, N/A, PMO (Director Actrec) Splitting
Fabrication, assembly, painting and testing at the CONTRACTORs works, packing, transportation, safe
Scanning Fabry-Perot Interferometer with Control Box
ANNUAL MAINTENANCE SERVICES FOR WATER PURIFICATION AND CONDITIONING SYSTEM (Version 2) - water purifer, water cooler and cooler cum purifer; 10 and above; PACKAGE-5 : Water purifier and conditioning system maintenance involving basic servicing, filte..
120 MHz 2 Channel Waveform Generator
Repair of Helium Turbo Circulator
Ball Millfor Laboratory (Q3)
Rotating Irradiation Device
Telematics VPN Router for SIP to PRI Gateway System
Energy Dispersive X-ray Spectrometer
Gantry stage with four axis motion controller ( processing of 2D profiles and independent access to
A3 Size Multifunction Printer (MFP) (Q2)
A3 Size Multifunction Printer (MFP) (Q2)
A3 Size Multifunction Printer (MFP) (Q2)
Custom Bid for Services - Maintenance contract for 320 KVA DG Set Similar Category Operation and Maintenance Services of Power Generator(DG-Set)
Supply of instrument spares for Ash handling System of
Carbocyanine dye based formulation containing three different dye solutions
Refilling of Ultra High Purity Argon gas with 99.9995% purity (Grade 5.5) in department gas cylinder
Integrated NIM Rack
Transverse Expansion Screw, Straight Sectional Mini Screw, Angulated Sectional Mini Screw, Straight Sectional Medium Screw, Angulated Sectional Medium Screw, Three Dimensional Screw, Orthodontic Acrylics Powder, Orthodontic Acrylics Liquid, Orthodontic Acrylics Concentrate Liquid
Analog to Digital Converter with FPGA DSP Processing
H2S Gas Transmitter/Detector (0-20ppm), Spare sensor (0- 20 ppm)
5.5KL frame mounted cryogenic tanks for storage of liquid nitrogen
11 TR ductable Air Conditioner with all accessories for Workshop CNC room and DG UPS room
BGO Gamma Detector
Hylam sheet of size: 4 feet long X 4 feet wide X 50 mm thick (Industrial grade), Hylam rod of size: 200 mm dia X 1 meter length (Industrial grade)
Tarpaulins Madefrom High Density Polyethylene (HDPE) Woven Fabrics (V3) Conformingto IS7903 (Q3)