Loading…
Loading…
3,647 results • Recent activity
Carbon Fiber Reinforced Polymer (300 Mm X 300 Mm X 1mm) Panel, Carbon Fiber Reinforced Polymer (300 Mm X 300 Mm X 2mm) Panel, Carbon Fiber Reinforced Polymer (600 Mm X 600 Mm X 1mm) Panel, Carbon Fiber Reinforced Polymer (600 Mm X 600 Mm X 2mm) Panel, Carbon Fiber Rohacell Sandwich Reinforced Polymer (300 Mm X 300 Mm X 7mm) Panel, Carbon Fiber Rohacell Sandwich Reinforced Polymer (600 Mm X 600 Mm X 7mm) Panel, Glass Fiber Reinforced Polymer (300 Mm X 300 Mm X 1mm) Panel, Glass Fiber Reinforced Polymer (300 Mm X 300 Mm X 2mm) Panel, Glass Fiber Reinforced Polymer (600 Mm X 600 Mm X 1mm) Panel, Glass Fiber Reinforced Polymer (600 Mm X 300 Mm X 2mm) Panel, Glass Fiber Rohacell Sandwich Reinforced Polymer (300 Mm X 300 Mm X 7mm) Panel, Glass Fiber Rohacell Sandwich Reinforced Polymer (600 Mm X 600 Mm X 7mm) Panel
Cloth Bag for Solvent Extraction Process
Minus 12 to plus 15 PSID Pressure Scanner 32 Channel 0 point 063Inch OD and 90deg orientation pneumatic tubulation Purge Gen 2 DTC with single range calibration, Minus 12 to Plus 30 PSID Pressure Scanner 32 Channel 0 point 063Inch OD and 90deg orientation pneumatic tubulation Purge Gen 2 DTC with single range calibration, 0 to plus 75 PSID Pressure Scanner 32 Channel 0 point 063Inch OD and 90deg orientation pneumatic tubulation Purge Gen 2 DTC with single range calibration, DTC INITIUM DATA ACQUISITION SYSTEM, Power supply cum DTC Intium Interface unit Universal AC Input 24V DC output, Power and Commnication cable integrated Cat 5 power hardware trigger circular twist lock connection 10 feet length
SPECTROPHOTOMETER (Q2) (3 (3 ))
Extension of Power Supply Connection to NGO Transit Facility from OTF Ramgarh Transformer alongwith Earthing
Forklifts (V2) as per IS 6765:2003 and IS 10517 (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2026/B/7117524 Dated : 16-01-2026 Bid Document 1/11 Number of Auto Extension count 3 Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority DRDO Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 84000 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 18 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be 2/11 in favour of Beneficiary, wherever it is applicable. Beneficiary : OS & Scientist H High Energy Materials Research Laboratory, Department of Defence Research & Development, Office of DG (ACE), Ministry of Defence (The Director, Hemrl)