Loading…
Loading…
3,696 results • Latest
Computer Table (V3) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 5 Days Bid Number : GEM/2026/B/7107411 Dated : 13-01-2026 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 50000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Custom Bid for Services - Operation of Mechanical Properties Evaluation Facilities & Testing of Samples using UTM as per spec No HEMRL IDEA GEN SPEC 2026 01 Similar Category Operation and Maintenance Of Electrical Systems/Electrical Installations
TIG 450SC GRIP WD 8P U/D HFL 4M MAKE -EWM TETRIX, FOOT REMOTE CONTROL RTF1 19POL 5M, MAKE - EWM TETRIX
Heat Shrink Sleeve 2mm Black, Heat Shrink Sleeve 2mm Red, Heat Shrink Sleeve 3mm Black, Heat Shrink Sleeve 3mm Red, Heat Shrink Sleeve 5mm Black, Heat Shrink Sleeve 5mm Red, Heat Shrink Sleeve 10mm Black, Heat Shrink Sleeve 12mm Black, Heat Shrink Sleeve 25mm Yellow, Heat Shrink Sleeve 35mm Yellow
E - Tourist Vehicle/Golf Cart (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2026/B/7072465 Dated : 05-01-2026 Bid Document 1/10 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 5 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority DRDO Auto CRAC Days 60 Quality Assurance Plan document 1767608598.pdf Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 17 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. 2/10 Beneficiary : DIRECTOR, RCI Research Centre Imarat Po Vignyana Kancha Hyd 69, Department of Defence Research & Development, Office of DG (MSS), Ministry of Defence (Director, Rci)
Interactive Display, Visual Presenter, Digital Signal Processor, Instant Communicator, HDMI Switcher, Microphone, Integrated Zone Amplifier, Surface Mount Loudspeakers, Media processor, Display on Side walls, Floor Mount Rack, Cabling, Work Test table I, Work Test table II, Work Test table III, Test Support Elevated, Work Test Table IV, Three Seater Lounge Chair