Loading…
Loading…
3,666 results • Latest
Video Wall Controller
Assy Instrument Panel RH As per Appendix A, Assy Integrated Drivers Switch Board As per Appendix A, Assy Integrated Fuel, Bilge, Charger Box As per Appendix A, Assy Inter Vehicle Starting Socket As per Appendix A, Assy Fuel Level Indicator Box As per Appendix A, Assy Instrument Panel Junction Box As per Appendix A, Assy Engine Control Junction Box As per Appendix A, Assy Master Relay Box As per Appendix A, Assy Turret Switch Board As per Appendix A, Assy NBC Control Box As per Appendix A, Assy EMI Filter Box As per Appendix A, Assy Turret Power Control Box As per Appendix A, Assy Turret Distribution Junction Box As per Appendix A, Validation testing charges As per Appendix B
I STAT CG4 PLUS CARTRIDGE (25 PER PACK)
ISTAT CHEM 8 PLUS CARTRIDGE (25 PER PACK)
Toner Cartridges/Ink Cartridges/Consumables for Printers (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Custom Bid for Services - Job work for operating Bio- Methane Purification & Compressor Unit Similar Category Operation And Maintenance Of Other Machines And Plants
Supply Installation and Commissioning of New Generation Firewall with Layer 3 Switch
Smart Access Cards with Badge Holders I Card Lanyards and
IBC along with associated harness set & MIL grade connectors, Development of Isolated Boost Converter– NRE charges, Qualification testing for IBC
High End Laptop - Notebook (Q2) MSE Relaxation for Turnover Yes | Complete Startup Relaxation for Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 3 Bid Number : GEM/2025/B/7046053 Dated : 26-12-2025 Bid Document 1/10 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 35400 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 14 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Director Dipr, Department of Defence Research & Development, Office of DG (SSS), Ministry of Defence (Director Dipr)
Event or Seminar or Workshop or Exhibition or Expo Management Service - National; Theme Based Events; Conceptualization and Planning, Coordination and Staffing, Participation arrangements, Venue Development, Complete Execution of Activity; Buyer prem..
Monoclonal Antibody Production against Antigen
Lug-1000 as per Spec. no. DRDO-ARDE-ADM-SPECN-03- 2023
FREEZE DRYER
Coolant Oil for Digital Emitter Engine (DEE)
Toner Cartridges/Ink Cartridges/Consumables for Printers (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
Pneumatic Tyres For Passenger Car Vehicles - Diagonal And Radial Ply Marked to IS 15633 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Custom Bid for Services - COMPREHENSIVE AMC OF SERVER FOR 03 YEARS Similar Category Customized AMC/CMC for Pre-owned Products
Custom Bid for Services - TECHNICAL SUPPORT AND TRIALS ACTIVITIES Similar Category Support Services
DEVELOPMENT OF TEST BOX FOR SENSORS
Markers and Highlighters (Q4), Manual Pencil Sharpener (V3) (Q4), Eraser (V2) (Q4), Black Lead Pencils (V3) Conforming to IS 1375 (Q4), Stationery Scissors (V2) Conforming to IS 989 (Q4), Writing Pens (Q4), Register (V2) (Q4), Staple Pins/Staples(V3) (Q4), Tags For Files (V3) Conforming to IS 8499 (Q4), Glue Stick (V3) (Q4), Staplers(V3) (Q4), File/Folder (V3) (Q4), Binder Clips (V3) Conforming to IS 8231 (Q4), Paper Clips (V2) Conforming to IS 5650 (Q4), Paper Punch Machine(V2) (Q4), Correspondence Envelopes (V3) (Q4), Plain Copier Paper (V3) ISI Marked to IS 14490 (Q4), Sticky Notes (V2) (Q4), Electronic Calculator (V2) (Q4), Desk Pads - Writing (V2) (Q4) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Steering Tie rod end joints Tie rod end, Front Suspension Kit, Radiator Mounting Rubber Pad, Front Wheel Break Pad Both Left and right, Shock absorber both lest and right, Front wheel brake disc both left and right, Rear brake wheel and cylinder both left and right, Rear wheel brakeshoe both left and right, Front wheel bearing both left and right, Rear wheel bearing both left and right, Propeller shaft cross joint, Steearing shaft cross joint, Rear leaf spring Assy left and right, Leaf spring bush
Correction Fluid Pen(V3) (Q4), Metric Steel Scales (V3) Conforming to IS 1481 (Q4) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Paper Weights (V2) (Q4) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Tape Dispensers (V2) (Q3), Whiteboard Duster (V2) (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Pads for Rubber Stamps (V2) Conforming to IS 4747 (Q4), Stamp-Pad Ink (V2) Conforming to IS 393 (Q4) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Secondary Sealed Cells and Batteries For Portable Application - Nickel Metal Hydride Conforming To IS 16048 (Part 2) (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Development, Manufacturing and Supply of Mobile Firing Platform
Vinyl Tape (Q3), Cleaning Duster (V3) (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Audio Processing Modules, Audio LRU Mating Connector, Binaural Listening Device, Programmable GPIO Device, Programmable Switch Mode Power Supply, Anti static mats and grounding for Audio lab
Lead Acid Traction Batteries (V2) Conforming To IS 5154 (Part 1 and 2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 10 Bid Number : GEM/2025/B/7033701 Dated : 24-12-2025 Bid Document 1/7 Number of Auto Extension count 3 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 16 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Director, GTRE Gas Turbine Research Establishment, DRDO, C V Raman Nagar, Bengaluru, Karnataka-560093 (Director Gtre)
High conductivity copper electrical multi core cable
Fume Hood
As per Tender Documents
Paper-based Printing Services - Printing with Material; Sheet or Card (As per Scope of Work); Digital
Poly (Tetra methylene ether) glycol molecular weight 2900, Poly (Tetra methylene ether) glycol molecular weight 2000
Dual Sensor Vibration Data Logger with External Trigger
Micro/Semi-Micro/Analytical weighing balance (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
Laser marking machine (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Laptop and Accessories
Desert Cooler 60L with structural Steel Stand
Procurement of Electrical Connectors for EER
Recirculating chiller (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2026/B/7080159 Dated : 08-01-2026 Bid Document 1/10 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority DRDO Auto CRAC Days 60 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 150000 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 18 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. 2/10 (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Director Defence Metallurgical Research Laboratory, Post: Kanchanbagh, Hyderabad - 500 058. (The Director, Dmrl)
Ferric Oxide Red, Nickel Oxide Green, Cobalt Oxide Black
HSS high speed hand hack saw blade Type A, Jig saw blade 92 mm length, Jig saw blade 100 mm length, Ferrous metal cutting wheel, Triangular file 150mm, Flat file 150mm, Half round file 150mm, Flat file 250mm, Round file 150mm, Flat file 300mm, Square file 150mm, Square file 200mm, Square file 300mm, Half Round file 200mm, Half Round file 300mm, Round file 250mm, Round File 200mm, Round file 300mm, Triangular file 250mm, Triangular file 300mm, HSS Drill bits set 70 pcs Stanley make, HSS Thread TAP SET M10X1Point5, HSS Thread TAP SET M3X0Point5, HSS Thread TAP SET M12X1Point5, HSS Thread TAP SET M4X0Point7, HSS Thread TAP SET M6X1Point0, HSS Thread TAP SET M5X0Point8, HSS Thread TAP SET M8X1Point25, HSS Thread TAP SET M14X2Point0, HSS Thread TAP SET M16X2Point0, Solid Carbide Drill 3mm x 61 mm, Solid Carbide Drill 4 mm x 75mm, Solid Carbide Drill 5mm x 86 mm, Solid Carbide Drill 6 mm x 93 mm, Solid Carbide Drill 7 mm x 109 mm, Solid Carbide Drill 8 mm x 117 mm, Solid Carbide Drill 9 mm x 125 mm, Solid Carbide Drill 10 mm x 100 mm, Solid Carbide Drill 11 mm x 142 mm, Solid Carbide Drill 12 mm x 151 mm, Solid Carbide Drill 14 mm x 110 mm, Solid Carbide Drill 8Point4 mm x 117 mm, Solid Carbide Drill 3Point1mm x 63 mm, Solid Carbide Drill 3Point2 mm x 63 mm, Solid Carbide Drill 3Point3mm x 63 mm, Solid Carbide Drill 3Point4mm x 63 mm, Solid Carbide Drill 3Point5mm X 63 mm, Solid Carbide Drill 3Point6mm x 63 mm, Solid Carbide Drill 3Point7mm x 63 mm, Solid Carbide Drill 3Point8 mm x 63 mm, Solid Carbide Drill 3Point9 mm x 63 mm, Solid Carbide Drill 4Point1mm x 63 mm, Solid Carbide Drill 4Point2mm X 75 mm, Solid Carbide Drill 4Point3mm x 63 mm, Solid Carbide Drill 4Point4mm x 63 mm, Solid Carbide Drill 4Point6mm x 63 mm, Solid Carbide Drill 4Point7mm x 63 mm, Solid Carbide Drill Bid Number : GEM/2025/B/6515747 Dated : 23-08-2025 Bid Document 1/63 Item Category 4Point8mm x 63 mm, Solid Carbide Drill 4Point9mm x 63 mm, Solid Carbide Drill 5Point1mm x 76 mm, Solid Carbide Drill 5Point2mm x 76 mm, Solid Carbide Drill 5Point3mm x 76 mm, Solid Carbide Drill 5Point4mm x 76 mm, Solid Carbide Drill 5Point5mm x 76 mm, Solid Carbide Drill 5Point6mm x 76 mm, Solid Carbide Drill 5Point7mm x 76 mm, Solid Carbide Drill 5Point8mm x 76 mm, Solid Carbide Drill 5Point9mm x 76 mm, Solid Carbide Drill 6Point1mm x 79 mm, Solid Carbide Drill 6Point2mm x 79 mm, Solid Carbide Drill 6Point3mm x 79 mm, Solid Carbide Drill 6Point4mm x 98 mm, Solid Carbide Drill 6Point5mm x 79 mm, Solid Carbide Drill 6Point6mm x 79 mm, Solid Carbide Drill 6Point7mm x 79 mm, Solid Carbide Drill 6Point8mm x 79 mm, Solid Carbide Drill 6Point9mm x 79 mm, Solid Carbide Drill 7Point1mm x 79 mm, Solid Carbide Drill 7Point2mm x 79 mm, Solid Carbide Drill 7Point3mm x 79 mm, Solid Carbide Drill 7Point4mm x 79 mm, Solid Carbide Drill 7Point5mm x 79 mm, Solid Carbide Drill 7Point6mm x 89 mm, Solid Carbide Drill 7Point7mm x 79 mm, Solid Carbide Drill 7Point8mm x 79 mm, Solid Carbide Drill 7Point9mm x 79 mm, Solid Carbide Drill 8Point1mm x 89 mm, Solid Carbide Drill 8Point2mm x 89 mm, Solid Carbide Drill 8Point5mm x 89 mm, Solid Carbide Drill 8Point6mm x 89 mm, Solid Carbide Drill 8Point7mm x 89 mm, Solid Carbide Drill 8Point8mm x 89 mm, Solid Carbide Drill 8Point9mm x 103 mm, Solid Carbide Drill 9Point1mm x 89 mm, Solid Carbide Drill 9Point2mm x 89 mm, Solid Carbide Drill 9Point3mm x 89 mm, Solid Carbide Drill 9Point4mm x 89 mm, Solid Carbide Drill 9Point5mm x 89 mm, Solid Carbide Drill 9Point6mm x 89 mm, Solid Carbide Drill 9Point7mm x 89 mm, Solid Carbide Drill 9Point8mm x 100 mm, Solid Carbide Drill 9Point9mm x 89 mm, Solid Carbide Drill 10Point1mm x 100 mm, Solid Carbide Drill 10Point2mm x 100 mm, Solid Carbide Drill 10Point3mm x 120 mm, Solid Carbide Drill 10Point4mm x 120 mm, Solid Carbide Drill 12Point3mm x 110 mm, Flat file 200mm
Temperature Monitoring and Data Acquisition System
Manpower Outsourcing Services - Minimum wage - Highly- Skilled; Graduate; Admin
Custom Bid for Services - Annual Maintenance Contract for Propellant Cutting Machine and Utilities as per Spec no HEMRL SRP 2025 SPEC 826 APCS Similar Category Customized AMC/CMC for Pre-owned Products
Calibration Services - Mechanical Measuring Instruments; Dimension; NABL Labs; Hybrid (detailed in scope of work)
Gas Flow Controller