Loading…
Loading…
641 results • Recent activity
Schneider electric Polycarbonate Mushroom Emergency Push, Schneider electric Polycarbonate Mushroom Emergency Push Button Switch, Warranty 1 year
SHAVISON General Purpose Battery Charger suitable for charging, SHAVISON General Purpose Battery Charger suitable for charging Tubular Lead acid / VRLA/SMF/ Flat Plate Lead-Acid battery
Abrasion/Rub Tester
Endless Power transmission belt 2470X50, Timing Belt 2100 X 14 X 40 mm, Weighing belt BB200 AA415 Conveyor Belt, Round belt 6mmX2480, MOC- PU, Timing belt 30 T10 920, MOC- PU, Flat belt 1750X350, MOC- TPU, Flat belt 1560X350, MOC- TPU, Belt FHP 2130, Ruflex V Belt 3L270, GATES, Polyurethane belt 7M500, GATES, UMC round belt, 3mm dia elastic 362mm, Vertical mvemnt teeth belt, 720 8MGT3 20, Horizontal movement teeth belt, 475 5GT3 25, Conveyor belt, L - 400 mm, W-100, No. of, Conveyor Belt 20160 X 150 X 2mm, Conveyor Belt 15980 X 150 X 2mm, Conveyor Belt 9780X150X2mm Material PVC, Conveyor Belt 4740 X 150 X 2mm, Inclined conveyor 2040X150, MOC- TPVC, Flat belt 730X155, MOC- TPU, Inclined conveyor 4280X395X3.5mm, Scan Flat weighing belt, 1140X400X2mm, Scan big bag rejection, 1990X400X2mm, Small pouch rejection motor to pulley, 430X10
Custom Bid for Services - Descaling of Compressors Similar Category Operation And Maintenance Of Gas Compressor Station
Hydrochloric Acid (V3) Conforming to IS 265 (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6844877 Dated : 09-12-2025 Bid Document 1/9, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No