Loading…
Loading…
3,231 results • Latest
Computational systems along with Breach & Attack Simulation system solution
Cleaning, Sanitation and Disinfection Service - Outcome Based - Office/Commercial/Institutions/Residential; General Cleaning (Sweeping, Mopping, dusting); Indoor and Outdoor
SHS 50 by 50, SHS 75 by 75, RHS 75 by 35, Base Plate, Roofing Sheet, Fasteners, Labour Charges, Any Other Civil and Electrical Work
Supply and Installation of Multispectral Camera for Integration with the CDAC Induscopter Drone
Mini Desktop with dual Monitor
Servers (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Office Space; Mobile Storage System; Service Provider
Television (V3) (Q2)
SUPPLY, INSTALLATION & COMMISSIONING OF APPLE SORTING & GRADING MACHINE
GALTECH 75 Inch Display Interactive Panel with CPU with, GALTECH 75 Inch Display Interactive Panel with CPU with warranty 3 Years
SITC of twin lobe root air blower assembly Capacity: 30 m3 hr, Pressure: 4 mwc with Motor 2.24 kW a, SITC of twin lobe root air blower assembly Capacity: 130 m3/hr, Pressure: 4 mwc with Motor 3.75 kW a, Dismantling of the old twin lobe root air blower
FOXIT PDF Viewer and Writer Perpetual
SHREE RAJ LIME AND MINERALS Hydrated lime for Bulk Supply, SHREE RAJ LIME AND MINERALS Hydrated lime for Bulk Supply Size upto 50 kilogram
Electronic Components and consumable Items
Unbranded Overnighter Size Hard Shell Suitcase
Custom 320-430 nm Single-Mode Fiber Optic Patch Cable (SM300 Configuration), Custom 780 - 970 nm Single-Mode Fiber Optic Patch Cable (Armored Configuration), Custom 780 - 970 nm Single-Mode Fiber Optic Patch Cable (Configured)
Digital Storage Oscilloscope (Q3)
Supply and Installation of Shodan Search Engine– Small business plan for 1 year, Make & Model: Shod
Supply and Installation of HexaCopter Drone with all accessories
Custom Bid for Services - Upgrade and maintenance of Cadence PCB design tools for a period of three years Similar Category 3D Printing Service Design Installation and Maintenance of Educational Lab/Centre
Hiring of Professionals for Application Development and Maintenance - Imaging/GIS related; GIS Developer/Analyst; 2 years to 5 years of experience, Hiring of Professionals for Application Development and Maintenance - Imaging/GIS related; Senior GIS Developer; 4 years to 6 years of experience
Virtual Machine (Compute) - Virtual Private Cloud (VPC); Ubuntu Operating System; 16; 4; 1:2; Application; Primary DC; 400
Pest and Animal Control Service - Maintenance Contract; 12 months; General Pests/Insects Control, Pest and Animal Control Service - Maintenance Contract; 12 months; Rodent Control
Hiring of Professionals for Application Development and Maintenance - Development and related roles; Consultant; Six years and above experience, Hiring of Professionals for Application Development and Maintenance - Development and related roles; Senior Software Developer; 3 years and above experience, Hiring of Professionals for Application Development and Maintenance - Development and related roles; Team Lead NIche Area; 6 years and above experience
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years of Experience and Turnover No
Internal Storage Device (SSD/HDD) (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Custom Bid for Services - Renewal of software subscription and RMA of Radware SSL Offloader Similar Category Support Services
Climate Chamber
Hot Air Oven (FSSAI) (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 5 Bid Number : GEM/2026/B/7115212 Dated : 15-01-2026 Bid Document 1/8 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 3.00 ( ) Duration of ePBG required (Months). 38 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : C-DAC Kolkata Centre for Development of Advanced Computing (C-DAC) (Ministry of Electronics & Information Technology, Govt of India) Plot - E2/1, GP Block, Sector V, Salt Lake Electronics Complex, Bidhannagar, Kolkata, West Bengal PIN- 700091 Ph: 033-23574998 (Centre For Development Of Advanced Computing, Kolkata)
Revolving Chair (V5) (Q2) (3 (3 ))
Revolving Chair (V5) (Q2) (3 (3 ))
Customized AMC/CMC for Pre-owned Products - HPC facility including interconnect, storage, switches and relevant hardware; DDN, Bull Sequana, Mellanox, Cisco, Raritan; Comprehensive Maintenance Contract (CMC); All Time; Yes
Red Hat Enterprise Linux for Virtual Datacenters Standard with 3 years supports
Online UPS (>10 KVA) With Battery (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Supply and Installation of Comprehensive, Integrated Electronic Design Automation (EDA) Suite
Supply and Installation of Network attached storage device - Capacity of 16Tb, centralized network b
Battery Operated Self Stirring Insulated Mugs with Lid
Custom Bid for Services - Running Canteen for Students NIELIT Aurangabad Similar Category Canteen Service - Percentage Model Canteen Service - Best Price on Fixed Menu Rate Model Canteen Service - Employee Welfare Model
Procurement of Power Transistor
FPGA Design software, development boards and other starter, evaluation kits
Multifunction Machine MFM (V2) (Q2), Computer Printer (V2) (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6594034 Dated : 26-08-2025 Bid Document 1/12 Bid to RA enabled No ITC available to buyer Yes Type of Bid Two Packet Bid Primary product category Multifunction Machine MFM (V2) Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Financial Document Required Yes Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank ICICI (%) ePBG Percentage(%) 3.00 ( ) Duration of ePBG required (Months). 62 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : HOD (GeM) Hall No. 2 & 3, 6th Floor, Nbcc Tower-15, Bhikaji Cama Place, New Delhi-110066, Department of Electronics and Information Technology, National Informatics Centre Services Incorporated (NICSI), Ministry of Electronics and Information Technology (Ramdatt Upadhyay) 2/12 Splitting
IO library for TSMC 55nm ULP eFlash Technology
Annual Maintenance Contract for Networking Devices (Version 2) - Routers; CISCO, Annual Maintenance Contract for Networking Devices (Version 2) - L2 Switch; CISCO
REFERENCE CLASS ELECTROMETER AND ACCESSORIES
EXIDE 12 V (for SPV application) Valve Regulated Lead Acid Battery,, EXIDE 12 V (for SPV application) Valve Regulated Lead Acid Battery, Battery Capacity - 100 Ah
ANNUAL MAINTENANCE SERVICE -DATA CENTER ASSETS - Network Devices; Router; OEM Authorised Service Provider
Unbranded Rectangular Plastic Name Badge with Pins
Unbranded 100 Pages Ruled White Executive Pad / Slip Pad
Tablet Computer (V2) (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6776245 Dated : 15-10-2025 Bid Document 1/8, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Financial Document Required Yes Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 38 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : CDAC, Vellayambalam, Thiruvanthapuram Thiruvananthapuram, Department of Electronics and Information Technology, Centre for Development of Advanced Computing (C-DAC), Ministry of Electronics and Information Technology (Centre For Development Of Advanced Computing) UIN Number NCTGC2415P 2/8
Pilot 1.0 mm Plastic Blue Gel Pen