Loading…
Loading…
5,675 results • Latest
Custom Bid for Services - Testing Inspection and Certification of Pressure vessels lifting tools and tackles EOT Mobile cranes etc for the year 2026 28 at NFL Vijaipur Guna Similar Category Testing Service for On-Board/Commissioned Equipment/Instrument related to Plant
Testing Service for On-Board/Commissioned Equipment Instrument related to Plant - Total price including all applicable taxes and duties for Biennial Rate Contract for VIBRATION Monitoring and Analysis of Rotary Equipment for finding root cause of t..
Handling and Transport on Lumpsum Basis - HANDLING AND TRANSPORT AT LIDHORA KHURD RAKE POINT
VIBRO-TRIP SWITCH
Tan Delta Test kit along with all accessories as per Buyer Specifications
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; As per NIT; As per NIT
TRICHLORO-ETHYLENE COMMERCIAL GRADE
BACK PULL OUT ASSEMBLY P 304, BACK PULL OUT ASSEMBLY P310
HYDRAULIC CRIMPING TOOL WITH HAND PUMP
Upgradation of Speedac NXT Controller
EES, EARTHING INTEGRITY MONITOR
STEAM TRAP TESTER
Goods Transport Service – Per Trip based Service - Agricultural; Platform Truck; 32 FT Truck
CONNECTING LINK 1 PITCH SIMPLEX
SPRIAL WOUND GASKET WITH DRAWING (A)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; ANNUAL MAINTENANCE CONTRACT FOR FIRE DETECTION AND EXTINGUISHING SYSTEM OF GTG, IN SGP, AT RCF THAL, WITH M/S MX SYSTEMS INTERNATIONAL PVT LTD, ON PROPRIE..
SPARES FOR SAMSON MAKE CONTROL VALVES
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - at RCF TROMBAY factory unit; as per SOW mentioned in NIT; as per SOW mentioned in NIT
5MM Non Ceramic Probe without armour, 3300 8mm Non ceramic rev mt case, Probe 3300 8 MM Bently 3/8-24 ARM, 3300 XL Standard Extention Cable
DEWATERING SUBMERSIBEL PUMP
Fire Breathing Apparatus with Trolley (SCBA) as per IS 10245 (Part 3) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Neem Kernal oil
Custom Bid for Services - Preparation of drawings of process equipment in AutoCad(dwg) format 2025 Similar Category Manpower Outsourcing Services - Man-days based Manpower Outsourcing Services - Minimum wage
300155386, 300014228, 300014128, 300014136, 300014234, 300014229, 300014135, 300155384, 300155385, 300155387, 300155389, 300155390, 300155391
Reflective tape (Red), Reflective tape WHITE, Reflective tape YELLOW
671117101, 671117102, 671117103, 671117104, 671117105, 671117106, 671117107, 671117108, 671117109, 671117110, 671117111, 671117112, 671117113, 671117114, 671117115
M9428560042 Make-Dynalco, model-M343, M9428560043 Dynalco, SST2400A - 439, M9428560044 Coonector with cable M349 & SST2400A
CS Gate Valve 6 Inch, CS Gate Valve 4 Inch
LOW LEVEL SWITCH
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; BIENNIAL RATE CONTRACT FOR DEPUTATION OF SERVICE ENGINEER FOR CNC LATHE MACHINE AT CENTRAL WORKSHOP; As per scope of work
LED Luminaire (Recessed Luminaire) (Ceiling Light) Conforming To IS 10322 (Part 5/Section 2) (V4) (Under BIS Scheme - II) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Handling and Transport on Lumpsum Basis - Handling and Transportation Contract slab basis at Chanderiya Rake Point
Complete Control Valve (100-UZV-4094)
TONNER NO 56F3000 FOR LEXMARK MS 3210dn
EES-AFDD, 16A, 30mA DIN RAIL MOUNTING, EES-AFDD, 25A, 30mA DIN RAIL MOUNTING
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Contract for Cleaning Storm Water & Plant internal drain Channels in Steam Generation Group of Plant; AS PER SCOPE OF WORK
Refilling of Fire Extinguisher Cylinders - Hydrotesting, Painting and Refilling of CO2 flooding system cylinders, CO2 Fire extinguishers and clean agent Fire Extinguishers; Hydrotesting of CO2 (45 Kg) cylinders; As per NIT, Refilling of Fire Extinguisher Cylinders - Hydrotesting, Painting and Refilling of CO2 flooding system cylinders, CO2 Fire extinguishers and clean agent Fire Extinguishers; Refilling of CO2 (45 Kg) cylinders; As per NIT, Refilling of Fire Extinguisher Cylinders - Hydrotesting, Painting and Refilling of CO2 flooding system cylinders, CO2 Fire extinguishers and clean agent Fire Extinguishers; Painting of C02 (45 Kg) cylinders; As per NIT, Refilling of Fire Extinguisher Cylinders - Hydrotesting Painting and Refilling of CO2 flooding system cylinders CO2 Fire extinguishers and clean agent Fire Extinguishers; Hydrotesting of CO2 22.5 Kg cylinders; As per NIT, Refilling of Fire Extinguisher Cylinders - Hydrotesting Painting and Refilling of CO2 flooding system cylinders CO2 Fire extinguishers and clean agent Fire Extinguishers; Refilling of CO2 22.5 Kg cylinders; As per NIT, Refilling of Fire Extinguisher Cylinders - Hydrotesting Painting and Refilling of CO2 flooding system cylinders CO2 Fire extinguishers and clean agent Fire Extinguishers; Painting of CO2 22.5 Kg cylinders; As per NIT, Refilling of Fire Extinguisher Cylinders - Hydrotesting Painting and Refilling of CO2 flooding system cylinders CO2 Fire extinguishers and clean agent Fire Extinguishers; Hydrotesting of C02 F Extn Cap 2 Kg; As per NIT, Refilling of Fire Extinguisher Cylinders - Hydrotesting Painting and Refilling of CO2 flooding system cylinders CO2 Fire extinguishers and clean agent Fire Extinguishers; Refilling of C02 F Extn Cap 2 Kg; As per NIT, Refilling of Fire Extinguisher Cylinders - Hydrotesting Painting and Refilling of CO2 flooding system cylinders CO2 Fire extinguishers and clean agent Fire Extinguishers; Painting of C02 F Extn Cap 2 Kg; As per NIT, Refilling of Fire Extinguisher Cylinders - Hydrotesting Painting and Refilling of CO2 flooding system cylinders CO2 Fire extinguishers and Bid Number : GEM/2026/B/7156042 Dated : 28-01-2026 Bid Document 1/24 clean agent Fire Extinguishers; Hydrotesting of C02 F Extn Cap 4.5 Kg; As per NIT, Refilling of Fire Extinguisher Cylinders - Hydrotesting Painting and Refilling of CO2 flooding system cylinders CO2 Fire extinguishers and clean agent Fire Extinguishers; Refilling of C02 F Extn Cap 4.5 Kg; As per NIT, Refilling of Fire Extinguisher Cylinders - Hydrotesting Painting and Refilling of CO2 flooding system cylinders CO2 Fire extinguishers and clean agent Fire Extinguishers; Painting of C02 F Extn Cap 4.5 Kg; As per NIT, Refilling of Fire Extinguisher Cylinders - Hydrotesting Painting and Refilling of CO2 flooding system cylinders CO2 Fire extinguishers and clean agent Fire Extinguishers; Hydrotesting of C02 F Extn Cap 6.5 Kg; As per NIT, Refilling of Fire Extinguisher Cylinders - Hydrotesting Painting and Refilling of CO2 flooding system cylinders CO2 Fire extinguishers and clean agent Fire Extinguishers; Refilling of C02 F Extn Cap 6.5 Kg; As per NIT, Refilling of Fire Extinguisher Cylinders - Hydrotesting Painting and Refilling of CO2 flooding system cylinders CO2 Fire extinguishers and clean agent Fire Extinguishers; Painting of C02 F Extn Cap 6.5 Kg; As per NIT, Refilling of Fire Extinguisher Cylinders - Hydrotesting Painting and Refilling of CO2 flooding system cylinders CO2 Fire extinguishers and clean agent Fire Extinguishers; Hydrotesting of clean agent F E CAP 2 kG; As per NIT, Refilling of Fire Extinguisher Cylinders - Hydrotesting, Painting and Refilling of CO2 flooding system cylinders, CO2 Fire extinguishers and clean agent Fire Extinguishers; Refilling of Claen agent F Extn Cap 2 Kg; As per NIT, Refilling of Fire Extinguisher Cylinders - Hydrotesting, Painting and Refilling of CO2 flooding system cylinders, CO2 Fire extinguishers and clean agent Fire Extinguishers; Painting of Clean agent F Extn Cap 2 Kg; As per NIT
Dew guard sheets size 50 x 75 mm, Dew guard sheets size 75 x 100 mm, Dew guard sheets size 100 x 150 mm, Dew guard sheets size 150 x 150 mm
Customized AMC/CMC for Pre-owned Products - As per scope; As per scope; Annual Maintenance Contract (AMC); As per scope; Yes
Valmet Actuator Model: - ECF-200E-80, Valmet Actuator Model: - ECF-80E-22
SHAFT STEEL FOR KHIMLINE PUMP
Pneumatic Positioner
Complete Gear Box between Benfield Circulation HP and LP Pump including charges for TPI agency, Complete set of Bearings for Low Speed Shaft, Complete set of Bearings for High Speed Shaft, Complete matched Set of Spare Gear Internals, Complete set of Oil Seals of Gearbox Unit, Charges for Service Engineer Normal 10 hours working, Charges for Service Engineer for overtime working hours