Loading…
Loading…
8,317 results • Recent activity
TERMINAL BUSHING, DRG: 21390801021 REV: 00, SPEC: TG60409 REV: 04, Mat. Code-W96413903716
acer Intel Core i3 - 1215U Entry Level Laptop - Notebook
Yokogawa 180mm chart paper, Yokogawa 180mm catridge, Chino LE5000 series cassette 250mm, K TYPE PVC Compensating CABLE, K TYPE Teflon Compensating CABLE, 2 Pin K type thermocouple connectors
Green Vegetables, Hara Masala, Onion
Material Code: W90311928870 UNIT OIL PURIFICATION SYSTEM DRG: 411928J7100 REV: 00 FOR KODERMA PROJECT, Material Code: W90311928889 OIL PURIFICATION SYSTEM (CENTRAL) DRG: 411928J7100 REV: 00, Material Code: W90318103427 SEPERATOR MOTOR FOR LUB OIL PURIFIER AS PER ST39013, Material Code: W90318103168 RTDS FOR OIL PURIFICATION UNIT: 1 NO. EACH TYPE AND RANGE, Material Code: W90318103150 PRESSURE SWITCH FOR OIL PURIFICATION UNIT: 1 NO. EACH TYPE AND RANGE, Material Code: W90318103265 MANDATORY SPARE FOR DPS ACROSS POLISHING FILTER OF OIL PURIFIER UNIT, Material Code: W90318103192 LEVEL SWITCH FOR OIL PURIFICATION UNIT: 1 NO. OF EACH TYPE AND RANGE, MATERIAL CODE: W90318103176 PRESSURE INDICATORS FOR OIL PURIFICATION UNIT: 1 NO. EACH TYPE AND RANGE, MATERIAL CODE: W90318103184 TEMP INDICATOR FOR OIL PURIFICATION UNIT: 1 NO OF EACH TYPE AND RANGE, MATERIAL CODE: W90318103290 MANDATORY SPARES FOR FLOW SWITCH OF OIL PURIFIER UNIT, Supervision of Erection & Commissioning Lump sum per man day charges at site, including every expens, Supervision of Erection & Commissioning Lump sum per visit charges (to & fro) including travelling t, PERFORMANCE TEST FOR PARTICLE SIZE OF IMPURITIES AND MOISTURE CONTENTS FOR LUBE OI
Hydraulic Motors (Q3)