Loading…
Loading…
9,198 results • Latest
Providing laying of 800 mm i/d RCC NP-3 inside HDPE Lining Pipe sewer, construction of Brick Masonry Manhole chamber, Sewerage House Connections, NHAI crossing at 1 No. point complete at Capitol Hospital (Amritsar Bypass) upto Bughipura chowk at Moga
Painting of Civil Structure, Painting, Rose Beds, Fine grassing complete in all respects at 6 MLD Sewage Treatment Plant at Jaitu, District Faridkot
Operation and Maintenance of Main Pumping Station and 4 MLD Sewage Treatment Plant at Dholewala Road at Dharamkot Distt. Moga for 12 Months year 2026-27 (01.04.2026 to 31.03.2027)
E/A of Existing 10 MLD STP Bari haveli Ropar to 16.00 MLD STP and all other works contingent thereto based on any suitable sustainable proven biological Technology including other appurtenant works on turnkey basis as per DNIT Including O M of extend
P/L of Intercepting and Diversion Sewer Const of IPS Const of MPS Laying of Rising main and all other works contingent thereto in Lalru Town Distt S.A.S Nagar SBM 2.0 Scheme Const of STP 3.00 MLD and 3.50 MLD including FSTP all other work conting
Raising and Construction of Machine Holes Slabs and Additional Man hole in ward no. 74
Raising and Construction of Machine Holes Slabs and Additional Man hole for sewer missing links in Inds. Area B and Muradpura ward no. 74
Upgradation of 16 inch HDPE RCC NP3 Sewer line in front of D210 to D-228, Ph-VII, Focal Point in W. No. 25.
Prov Laying of additional manhole chamber in W. No. 80 (GQ).
Providing, Laying Up-Gradation of 10 inch dia. UPVC pipe at Subhash Nagar, Atal Nagar, Chanderlok Colony Street No. 5/5 and 6 of Sub in Wardno. 7 East Constituency.
Repair and Additional new manhole chamber in Ward no 67 (G.Q).
Upgradation of 4 inch DIK7 water Supply and 8 inch UPVC sewer line at Shastri nagar St. No. 8, Mayapuri, St. No. 5, Meena Masjid Tibba Road, Tibba Road, Shakti nagar Nr. Longia Steel in W. No. 11 (GQ).
Prov. and Inst. of 40 HP Deep Straight Bore Tubewell (against failed tubewell) at Puri Nursing Home, Ward No-47.
Prov. and Inst. of 25 HP Deep Straight Bore Tubewell (against failed tubewell) at Ramleela Park of Ambedkar Nagar, Ward No-47.
Annual maintenance of 5, 12.5, 25, 40, 50, 60 and 75 HP Motors and Starter Panels at Disposals in Zone-B.
Providing and Laying of UPVC pipe at 177 Welfare Society, Sector-39, W. No. 19 on East Constituency (Upgradation)
Providing and Installation of 25 HP Straight Bore T.Well Against Failed T. Well Sadhu Sundar Singh Colony St No.4, Issa Nagri,Ward No.78 (new).
Providing and Laying of 400 mm and 250 mm RCC NP3 Class Storm line at Kailash Nagar, St. No. 3, Springdale School Road to Cancer Road, W. No. 27 in South constituency (MLA Quota).
Disinfection of Drinking water with Sodium Hypochlorite for Zone-C, M.C. Ludhiana for 6 Months.
CONST. OF SHED AT COMMUNITY CENTER GHAGGA WARD NO.6
SILT CLEARANCE IN NALA AT NP GHAGGA
CONSTRUCTION OF FOOTPATH FROM MAHILPUR ADDA TO SERVICE CLUB, HOSHIARPUR
Construction of Drain Type-II both side From Kali Mata Mandir to Mehduda Road Ghanaur
P/FIXING INTERLOCKING PAVER BLOCKS IN DIFFERENT STREET OF WARD NO. 24 HOSHIARPUR
P/FIXING INTERLOCKING PAVER BLOCKS IN STREET H/O SHEE HARFI AND PALI WALI PURHIRAN, WARD NO. 19, HOSHIARPUR
Construction of Drain Type-II and Interlocking tiles from BSNL road to Masjid Road Ghanaur
ESTIMATE FOR INTERLOCKING PAVER BLOCKS IN PATHA MANDI, AFGAN ROAD SIDE BERMS, HOSHIARPUR
P/L I/L TILES FROM HARIMAJRA ROAD TO BALBIR SINGH WARAICH W NO 11
Construction of Drain Type-II and Interlocking tiles from Masjid to Office of the Nagar Panchayat Ghanaur
P/LAYING INTERLOCKING PAVER BLOCKS ON SIDE BERMS OF MOHALLA GURU NANAK NAGAR AND CC FLOORING ON BERMS OF BAL KRISHAN ROAD, HOSHIARPUR
Construction of Boundary wall MC Land (Back side of NP office) NP Ghanau
CONSTRUCTION OF TOILETS AND WALKING TRACK IN T/WELL WALI PARK, CENTRAL TOWN, WARD NO. 31 HOSHIARPUR.
P/L I/L TILES FROM AND R/G CHAMBER H/O PREM MISTRI, GURUDWARA GURU RAVIDAS W-9
CONSTRUCTION OF FOOTPATH ON ROAD BERMS FROM SHIMLA PAHARI CHOWK TO DHOBI GHAT CHOWK, HOSHIARPUR
CONST OF STORE ROOM IN NP OFFICE GHANAUR
P/FIXING INTERLOCKING PAVER BLOCKS IN DIFFERENT STREETS ADJOIN SINGH SABHA GURUDWARA SAHIB WARD NO. 21, HOSHIARPUR
CONST.OF METALLED ROAD BALIAL ROAD TO SANGATSAR NAGAR BHAWANIGARH W-12 and14
P/L C.C Flooring and Interlocking Tiles in different streets of Ekroop Avenue Panchayat, North Constituency, Amritsar. 2nd Attempt
P/L C.C Flooring and Interlocking Tiles in different streets of Chand Avenue Panchayat, North Constituency, Amritsar. 2nd Attempt
Construction of Road, Parking and Footpath Opposite Booking Agency no 14-75, Truck Stand Scheme.
DEVELOPMENT OF PARK NEAR CIA STAFF, SUIGARAN MOHALLA, BHAGAT SINGH CHOWNK ADN RAM ASHRAM WARD NO-40 Est Cost Rs. 9.83 lacs dt 04/05.05.2026
P/L SN-8 PIPE AND ROAD GULLIES NEAR CHAURASIA PAAN, WARD NO. 57 Est cost Rs. 2.61 lacs dt 25/26.05.2026
S/E OF STREET LIGHTS AT TAFAZALPURA PARK Est Cost Rs. 11.10 lacs dt 04/05.05.2026
S/E of Street Light Fountain chownk to Sherawala Gate Patiala. Est Cost Rs. 21.02 lacs dt 04/05.05.2026
Construction of Road, Parking and Footpath Opposite Booking Agency no 76-101, Truck Stand Scheme.
P/L C.C Flooring and Interlocking Tiles in different streets of Silver Estate Panchayat, North Constituency, Amritsar. 2nd Attempt
CONSTRUCTION OF ENTRY GATE STRUCTURE AT BHAGWAN PARSHURAM MANDIR EKTA NAGAR WARD 39, HOSHIARPUR. RPVS2
P/L Interlocking tiles Dhillon Niwas to stadium KSM Road at MC Rajpura
Supply of Cement Benches in different different wardsna
Pind vale Water Works teNvaSubmersible pump Lavana