Loading…
Loading…
1,004 results • Recent activity
Repair of damaged trenches sump well stairs and supply hoisting of trench covers at 132kv s/s malout
Repair of roof at 220kv ss Malerkotla
Repair of roof at 220kv ss mohali-1
dismantling of old damaged brick work and construction of rcc retaining wall at tower no 82 of 220kv line mohali nalagarh
Outsourcing of Labour Part for strengthening the distribution system by replacement of 8 meter poles and 9 mtr. , PVC cables area of Sub division Bariwala under DS Division Sri Muktsar Sahib under Ds Circle Sri Muktsar Sahib.
Design Manufacture Testing before dispatch Delivery of 52000 Nos. Male Female Contact Sets for 11KV 75 Amp GO Switches 99000 Nos. Male Female Contact Sets for 11 KV 400 Amp GO Switches as per PSPCL Specification no. QQ-2375.