Loading…
Loading…
4,884 results • Latest
Toner Cartridges/Ink Cartridges/Consumablesfor Printers (Q2) (PACOnly)
Upgradation of AM/PM/FM Modulation Analysis and Vector Signal Analysis in FSW26
PROGRAMMABLE ELECTRONIC BACK PRESSURE REGULATORS
High Performance, Manual, Quarter Turn On/Off Ball Valve. Size: 1/2" , End Connection: 1/2" FNPT. MOC:, High Performance, Manual, Quarter Turn On/Off Ball Valve. Size: 1/2" , End Connection: 1/2" OD Double
Annealed Copper Foil (0.05mm thick), Copper Foil without annealing (0.05mm thick)
Cybersecurity Infrastructure for VEDHAS
One Time Servicing of DI and RO Plants
HELICOIL TAP
Supply and Replacement of spares for Pump
DISCRETE SEMICONDUCTOR DEVICES (ACTIVE COMPONENT - TRANSISTOR) (Q3) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days Bid Number : GEM/2025/B/7003331 Dated : 22-12-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 3.00 ( ) Duration of ePBG required (Months). 14 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : ACCOUNT OFFICER U R Rao Satellite Centre, Department of Space, indian space research organization, Department of Space (Account Officer)
Manpower Outsourcing Services - Fixed Remuneration - Admin; Administrative Operator or Office Assistant or Executive Assistant; Graduate
EM Standard D connectors, EM High Density D connectors
Custom Bid for Services - NON COMPREHENSIVE AMC FOR WEIGHING BALANCE Similar Category Customized AMC/CMC for Pre-owned Products
Custom Bid for Services - REFURBISHMENT OF IBR STEAM HEADER AND PRESSURE RELIEF VALVE STATION Similar Category Operation And Maintenance Of Gas Compressor Station Operation And Maintenance Of Substation Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2)
SUPPLY OF LOAD CELL 25KN WITH CABLE AND ADAPTORS
Supply of Copper and Titanium Wire
Drilling Machine Bench Type/Pillar Type as per IS 2425 (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
AFNOR 15CDV6 steel hot rolled plates: 25(+ 1/-0) x 1000 x 2000 mm
ICSS-1218-321 strips-size 0.25 x 240 x L mm - 150 Kg, ICSS-1218-321 strips -size 0.3 x 240 x Lmm - 150 Kg, ICSS- 1218-321 strips - size 1.5 x 240 x L mm - 150 Kg, Manufacture and supply of ICSS-1218-321 grade strips: 150 Kg
Toner Cartridges/Ink Cartridges/Consumables for Printers (Q2) ( PAC Only ), Toner Cartridges/Ink Cartridges Consumables for Printers (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Laboratory Filter Papers (V2) (Q3)
Fire Breathing Apparatus SCBAasper IS10245 (Part2) (Q3)
Sodium Sulphate Anhydrous, AR
Copper Sulphate Pentahydrate
Annealed Aluminium Wire
Supply of Standard Measuring Pin Gauges
Toner Cartridges/Ink Cartridges/Consumablesfor Printers (Q2) (PACOnly)
Toner Cartridges/Ink Cartridges/Consumablesfor Printers (Q2) (PACOnly)
RF Connectors and Adapters
5KVA UPS with SNMP Card
SPARES FOR BLUESTAR INVERTER DUCTABLE AC
SUPPLY OF CHEMICALS
Fixed Computer Workstation (Q2)
RF Filters
Custom Bid for Services - Supply of Diesel Exhaust Fluid for one year Similar Category Refilling of Industrial Gases in Cylinders
Cotton Canvas Hand Gloves (SAIL) (Q3)
Layer 3 - Access Switch (Q2), Layer - 3 Core Switch (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller OEM Authorization Certificate, OEM Annual Turnover, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6798864 Dated : 24-10-2025 Bid Document 1/14, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Layer 3 - Access Switch Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 3.00 ( ) Duration of ePBG required (Months). 64 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Accounts Officer, URSC U R Rao Satellite Centre, Department of Space, indian space research organization, Department of Space (Accounts Officer, Ursc)
Custom Bid for Services - CUSTOM BID FOR FABRICATION OF FIRE HYDRANT SYSTEM Similar Category Piping Erection Service Operation And Maintenance Of Fire Fighting System Repair, Maintenance and Installation of Plant Systems/Equipments
Benchtop Digital Multi-Meter- 8.5 Digital Accuracy as per attached specifications
Storage and Transport cases
Brady Handheld Based / Battery Operated Label Printer
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Hot Rolled Steel Beam, Column, Channel and Angle Sections (V2) conforming to IS 808 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Hot Rolled Steel Beam, Column, Channel and Angle Sections (V2) conforming to IS 808 (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
SUPPLY OF VIDEO CONFERNCING SYSTEM MAKE-CISCO