Clearance of weed,booty, Sarkanda, silt and obstructions from the bed of Sahoke Drain in between R.D. 0-27000 before the flood season of 2026 to save nearby Abadies of villages Samaon,Gurthari, Khiwa dialuwala of tehsil Bhikhi District Mansa
Estimate for Internal Clearance including cleaning weed,jalla,booty,sarkanda etc and jungle clearance of motorable banks in between Chandbhan drain RD 0-16000 before flood season 2026 Distt.Faridkot
Clearance of Botty, (Water Hyacinths), Weed (carpet grass, elephan grass), Sarkanda ( Tripidium Bangalense),silt and obstructions from the bed of Lissara Nallah in between Rd 463385 to 437772 and 354646-341210 to save near by abadies agriculture
E-tenders are invited for the material required for Running and Maintenance of Twells of various blocks of BDC-2 Division, PWRMDC Ltd Hoshiarpur
ESTIMATE FOR CLEARING SARKANDA, WEED JALA, BOOTI ETC. FROM JUNGLE CLEARANCE OF MOTORABLE BANK FROM DAYALPURA DRAIN BETWEEN RD 12000 and 140000 DIST BATHINDA AND BARNALA BEFORE MONSOON SEASON 2026-27
Clearance of Botty, Weed,silt and obstructions from the bed of Bahadur Singh Wala drain in between Rd 0-61093 before the flood season of 2026 to save near by abadies of villages Heron Khurd,Khiwa,dhapai,Bhikhi and Borawal of Distt. Mansa.
work stations
Desilting/Clearing of Sarkanda, Weed, jala, booti etc from Lalton Pamal Drain in Between RD 0-45750 by mechinery
Clearing of Sarkanda, Weed, Jala, Booti etc from Porain Drain in between RD 0-15500 by Machinery
Clearing of Sarkanda, weed, Jala, Booti etc from malik drain in between R. D. 5540-35500 by machinery
Clearing of Sarkanda, Weed, Jaala, Booti etc. from Chachrari Drain in between RD 0-82800 by machinery.
Estimate for Construction of VR Bridge at RD 203200 of Bahadur Singh Wala Drain
Estimate for Construction of VR Bridge at RD 199400 of Bahadur Singh Wala Drain
Estimate for Cleaning weed jala booti sarkanda etc from Fazilka Drain RD 0 22000 Old Fazilka Drain RD 6500 8500 Theh qalandhar Drain RD 0 21000 Turkanwali Drain RD 0 30150 Syphon Cleaning at RD 9000 7600 of salemshah drain crossing Ditch Channel at
ESTIMATE FOR REHABILITATION, RENOVATION AND MODERNIZATION OF BUNDALA MINOR FROM RD 0-7350
ESTIMATE FOR REHABILITATION, RENOVATION AND MODERNIZATION OF CHECK MEHAR DISTY
Estimate for Reconstruction of fall at RD 10500 of 1-L Minor of Kokri
Estimate for construction of Udekaran Disty from RD 0-17565
Estimate for construction of Udekaran Disty from RD 51940 to 85140
Esimate for Construction of 5 no. of bridge of minor no 2 and 1 no of fall at rd 29672 of minor no 2
Clearance of Botty, Weed, silt and obstructions from the bed and side slopes of Dodra Link Drain in between Rd 0-21000 before the flood season of 2026 to save near by abadies of villages Chak Bhai ke,Budhlada and Gurne Khurd of Tehsil Budhlada Distt.
Estimate for Laying U/G Pipeline of outlet RD 33230-TF of Minor no. 2 of Barnala Disty
Estimate for Ensuring Routine operation of Canal/Distributiories/Minor under Abohar Canal and GW Division
Estimate for Flood Risk Mitigation by Construction of Sub Surface Drainage System in low lying pockets of village Abohar-1(Dhani Chirag) in District Fazilka.
Estimate for Flood Risk Mitigation by Laying of RCC Pipeline of dia 450 mm(2500 ftapprox.) through field to carry out excessive rain water to Kuraiwala Ennakhera Malout link drain from low lying fields of village EnnaKhera (Dhani Manjinder Singh)
Restoration of breach like damages at Kakodunga bund L/B embankment from Barbaruah Ali to Dhodar Ali.
M and R to Re-channelization of river Kundil by dredging at 8th mile, Purani Lakhimpuria and Koilabasti under Sadiya Civil Sub-Division.
Restoration of Kaldoba Embankment from the flood damages of river Gangadhar on its R/B.
A/E measures to protect Bhorali bari Kalita Gaon area from the erosion of river Buridehing Ph-I.Package No. 01
Anti erosion (A/E) measures on the L/B of Pagla River at Kathpuri area.
ESTIMATE FOR MOTORIZATION OF GATES FOR X REGULATOR AND HEAD REGULATOR RD 71084 MTR AND 88900 MTR AND WIRE FENCING ARROUND REGULATION HUT AT RD 71084 MTR OF KANDI CANAL STAGE 2
Hiring of Manpower ( Skilled/ Unskilled/ Semi-Skilled/ Highly skilled) Under Rajasthan Feeder and Ground Water Division, Ferozpur from RD 0 to 496000 of Rajasthan Feeder
ESTIMATE FOR ENSURING ROUTINE OPERATION OF CANAL, WATERCOURSES, LIFT SCHEMES, DISTRIBUTARIES, PIPELINE DURING KHARIF SEASON UNDER THE JURISDICTION OF KANDI CANAL STAGE 2 DIVISION , WRD, PUNJAB, HOSHIARPUR (JULY TO OCTOBER)
Estimate for laying underground pipeline of WATER COURSE OF OUTLET RD 117220/L of GHAGGAR BRANCH
Estimate for clearance of Weed, Jalla deela sarkanda jungle booti etc manually from inner section of KauliDisty RD 0-19158, Kauli Minor RD 0-22000, Mohabatpur Minor RD 0-12000 and 3-R Disty RD 0-23500.
ESIMATE FOR CONSTRUCTION OF WATER COURSES AT RD 14733/R OF DITCH MINOR UNDER JURISDICTION OF MADHOPUR SUB DIVISION
Estimate for Geophysical survey works at Madhopur Headworks Pathankot under Canal and Ground Water Division Gurdaspur
Hiring of Manpower ( Skilled/Unskilled/ Semi-Skilled/ Highly skilled) Under Fazilka Canal and Ground Water Division, WRD, Punjab, C.C. Ferozepur
Estimate for Lining/Relining of w/c of O/L 23000-TF of Longowal Disty of Village Lohakhera Distt. Sangrur (Project Balance Length of Kotla Branch)
Estimate for Protection of Scoured Area near downstream spillway bucket at RD 547 at RSD Project
Providing and laying 75mm thick compacted BM and 30 mm thick compacted SDBC from Rajiv Chownk to SBI Bank
Estimate for patch work on damaged road portion of project road CP 02 to Rajiv Chowk
Estimate for Annual Maintenance and Repair of Thein Nallah Diversion channel at RSD Project
Estimate for Relining/Lining of watercourse of Outlet RD 6200/R of Dehlwan Disty
Hiring of Manpower for ensuring routine operations of Canal/Disty/Minors/Sub-Minors under Bathinda Canal Sub Division, Bathinda.
Clearing weed booty sarkanda silt and obstruction etc from the bed and side slopes of Sirhind Choe in between R.D 418630-347000 near vill bazidpur kaul dhingi ladhaheri and and tungan Tehsil Nabha District Patiala before flood season of 2026
ESTIMATE FOR EXTENSION OF OUTLET 3044 T/F OFFTAKING FROM TAIL DISTRIBUTARY OF KANDI CANAL STAGE 2
Estimate for maintenance of Pojewal lift scheme,pojewal Distributory 1,Pojewal Distributary 2,Saroya Distributory and its distribution system ,Direct outlets RD 107.766,110.966,112.751km on Annunally Basis of kandi canal Stage 2
Dredging works along the River Brahmaputra at Kashohilla, Mayong with the help of hired IWAI Cutter Suction Dredger / Departmental Cutter Suction Dredger and fleet of machineries.
Protection of Desang left bank at Rongchual Changmai Gaon and its adjoining areas from the erosion of river Desang.