Loading…
Loading…
194 results • Recent activity
Clearing and removal of water hyacinth including weeds, thick and thorny floating jungles along with Clearing and removing solid / semisolid compact mass , clearing of jungles from the bank and slope of Adiganga Canal in between Kamalgazi downstream
Carrying out bank to bank cross section Survey maximum offset 2.00 m or at representative point from Ch. 3400 m to outfall point of Charial Main Khal (17850.00 m) for a length of 14450 m using Total Station Instrument, Auto level and Echo sound
Soil investigation work for the proposed boosting pump house over Charial Khal at ch.9000.00 m under Thakurpukur Maheshtala Block,Dist.South 24 Parganas under Suburban Drainage Sub Division.No.II of Suburban Drainage Division
Clearing and removal of water hyacinth under AMC for the period of 12 months including thick and throny jungles of Duma khal for a length of 1.75 km from Ch 0.00 km to 1.75 km within Block and PS Bongaon Dist North 24 parganas
Desiltation of Duma Khal from DS of Duma sluice to outfall point at Ichamati, for a length of 200 metre at Mouza Angrail GP Jhawdanga-I Block and PS Gaighata Dist North 24 parganas at Bongaon under Bidyadhari Drainage Sub Division
Repair and maintenance of 5 nos sluice and pump house at Bongaon of Bidyadhari Drainage Sub Division under Bidyadhari Drainage Division