Loading…
Loading…
54 results • Recent activity
Hiring vehicle for EE SBR UJVNL Munsiyari
Strengthening of hill slope by concrete cladding on left bank of river behind Control Room of Vyasi Dam at Juddo, Dehradun
Providing and Installation of Rock fall Barrier and slope stabilization work on hill slope behind Intake structure Control room at Dam site of Vyasi HEP
Preparation of Comprehensive and Bankable Detailed Project Report (DPR) of Sela Urthing Hydro-electric Project (114 MW) on River Dhauliganga in Pithoragarh District of Uttarakhand
Protection works for left bank approach road at Nala (J.P. nala, Dhindala nala) near village Kandriyan in Lakhwar Multipurpose Project
Providing consultancy services for obtaining Terms of Reference ToR and carrying out Environmental Impact Assessment EIA studies preparation of detailed and comprehensive Environment Management Plan EMP and obtaining Environmental Clearance from MoF