Loading…
Loading…
27,901 results • Latest
Construction of CC Road from Beside Sewa Hospital to Near Pulse Care Hospital in Ahladpurwa Ward No.6 Kamlabaad Badhauli at NPBKT.
Restoration of Road By Paver Finisher from Sarakpur Saraiyan Tiraha via House of Sanjay Singh to House of Ramesh Giri in Chakganjagiri at NPBKT.
Construction of CC Road from Near House of Ramkumar to Sakhiya Baba Mandir in Ward No.14 Akohari at NPBKT.
Work of installation of 10 HP tubewell near the Panchayat building in Ward No. 05 Hikma.
WARD NO 21 MOHALLA BADAUN DARWAZA MAI SHAHID AHMAD KE MAKAN SE MOIN KE MAKAN TAK CC ROAD EVAM NALI KA NIRMAN KARIYA
Construction of Drain and CC Road from Shivansh Enterprises to House of Jitendra Singh Baghel in RR Garden Colony in Ward No.14 Akohari at NPBKT.
Construction of Drain and CC Road Beside Lodhi Market in Ward No.8 Tarahiya at NPBKT.
Construction of Drain and Interlocking Road from House of Durga Singh to HOUSE OF Ramdev in Bhauli 2 ward No .2 at NPBKT.
Construction of Road from from House of Sushil Yadav via House of Ram Singh to House of Ramashankar in Ward No.5 Rampur Devrai at NPBKT.
Construction of Road from Tiles Road to House of Urmila Singh in Ward No.5 Rampur Devrai at NPBKT.
Construction of Road from Chandrika Devi Road to Poolside Portico in Ward No.1 Rampur Devrai at NPBKT.
Construction of Drain , CC Road from Infront House of Akash Yadav to infront of Manoj Yadav in Ward No.8 Tarahiya at NPBKT.
Improvement of Road from Chnadrika Devi Road to A.K.G Nursing College in Bhawanipur Ward No.1 at NPBKT.
Mohalla Mewat pump number 2 Mai Tanki Parisar Mein Interlocking tiles ka karya.
Construction of Drain and CC Road from House of Naveen Kumar via House of Kanha to House of Kamrudeen and From House of Waris to House of Bhure in Sai Nagar Ward No.19 Muslim Nagar at NPBKT
Kanha Gaushala mein samarsebal adhishthapan ka karya.
Construction of Drain and Side Patri Interlocking and Road work from Magath Chauraha to Shaadi Ghar in Magath Ward No.16 Bargadi Pratham at NPBKT.
Construction of RCC Drain and CC road from House of Naresh to House of Gaya Shankar Pal in Ward No.3 Sarakpur Saraiyan at NPBKT.
Ward No. 17, 18 Mohalla Chatta mein Mukesh Medical Store se Sun Rays School se Hote Hue G.D.A.V School and Other Sahayak Galiyo mein Nali and C.C Road Ka Nirmanh Work
Construction of Road from House of Ram Naresh Pal to Near House of Surendra Verma in Ward No.3 Sarkpur Saraiyan at NPBKT.
Amit Gupta ki dukaan se saptahik bajar rod Tak CC road va nali Nirman karya mohalla Rajendra Nagar.
Ward number 4 mohalla Mewat mein Ramesh Chandra Sharma ke Plot se Rakesh Sharma ke Makan Tak Interlocking road Va nali Nirman karya.
Construction of Road from Raitha Mukhya Marg to Infront House of Sanjay Rawat in Sarakpur Saraiyan at NPBKT
AS PER NIT
Construction of Drain and CC Road from Gopal Market to Near House of Harilal in Bhauli 2 Ward Nno.2 at NPBKT.
Mohalla Ratanpuri Mein Mahesh Gupta ke Makan se Anshu Gupta ke Makan Tak CC road V nali Nirman karya.
Construction of Drain and CC Road from Infront House of Lallan via House of Shri Krishna Singh to Neeraj Kumar Verma in Nandna Nayi Basti in Ward No.13 Nandna at NPBKT.
Ward number 4 mohalla Mewat mein Pump House ki Marmmat ka karya.
Construction of Drain and Interlocking Road from House of Amul to House of Rajaram via House of Bhallu to House of Shiv Kumar and Form House of Pappu Yadav to House of Ramkesh in Umarbhari Ward No.18 Mubarakpur at NPBKT.
Ward number 4 mohalla Mewat mein Janki Prasad ke Makan se Hari Singh Yadav ke plant Tak CC road Va nali Nirman karya.
AS PER NIT
Ward number 10 mohalla Meer Khan Babar Nagar mein natthu ke Makan se Rais Ahmad, Navi Ahmad ke Makan hote hue Ishrat ke Makan Tak CC road ba nali Nirman karya.
Nagar Panchayat karyalay mein store room Va Purane karyalay ki marmmat ka karya.
Bioremediation work For Drain Water treatment ka karya
Pipe Line Ki Lekeage Repair Work
NAGAR PANCHYAT NIDHOLI KALAN ME 120 WATT LED STREET LIGHTKE SAATH 07 METER G I OCTAZONAL POLE KI APURTI AUR FIXING KARYA NAGAR KE SIMA KE ANDAR VIVIRN WARD ME PRAKASH MARG STHAPNA KARYA
NAGAR PANCHYAT NIDHOLI KALAN ME 120 WATT LED STREET LIGHTKE SAATH 07 METER G I OCTAZONAL POLE KI APURTI AUR FIXING KARYA NAGAR KE SIMA KE ANDAR VIVIRN WARD ME PRAKASH MARG STHAPNA KARYA
KARYALAYA NAGAR PANCHYAT NIDHOLI KALAN KE PAAS MALIN BASTI ME STHIT NALKOOP PER GRID SOLAR POWER TUBEWELL KA KARYA
R O WATER COOLER MAYA STHAPANA
Wet Compost pit
MRF KI MACHINE WO SAUCHALAYA KA MARAMMAT KARYA
Ward No. 09 Mohalla Madar Gate mein Baba Mastram Seva Ashram Gate Mukti Dham se Hote Hue Har-Har Mahadev Mandir tak Interlock Dwara Side Patri Ka Nirmanh Work
Ward No. 06/02 Mohalla Nehru Ganj Mein Soham Tau Ashram se D.P.B.S Degree College Tak Cement Concrete Road and Interlock Dwara Side Patri Ka Nirmanh Work
Dumping Sthal Ki Boundry Near I.T.I
Construction of Drain and CC Road from Near Khushi Homes via House of Kamlesh to House of Guruji in Ward No.16 Bargadi Pratham at NPBKT.
Within the municipal area (covering Wards No. 01 through 34) Repair works at various locations involving RCC culverts, drains, interlocking roads, CC roads, channels, etc.
Construction of Drain and CC Road from House of Indra Pratap Singh to House of Viresh Kumar Singh in Ward No.15 Rudhi Pratham at NPBKT.
Construction of Drain and CC Road from House of Pappu Singh to House of Raman Singh in Sainik Vihar Colony in ward No.17 at NPBKT.
Construction of CC roads and improvement of RCC (Reinforced Concrete) drainage systems in Ward No. 05 of the Khoda-Makanpur municipal area specifically from Krishna Laundry to Aman Sharma house.
Construction of Drain AND CC Road from Nahar Road to House of Devendra Singh in Shiv Vihar Colony ward No.7 Mampur Bana at NPBKT.