Loading…
Loading…
3,088 results • Latest
WBM Road construction work in Rachna Nagar, Rammanohar Lohia Ward No. 05
CONSTRUCTION OF PCC ROAD, RCC DRAIN AND CULVERT FROM VIJAY TO BAGEECHA AT WD 04
CONSTRUCTION OF RCC DRAIN FROM UMESH PATEL TO NH7 AT WD 03
The financial year 2026- 27 Sanitation Branch
The financial year 2026- 27 water supply branch chemicals
THE FINANCIAL YEAR 2026-27 FOR ALL TYPES OF WATER SUPPLY MATERIAL
THE FINANCIAL YEAR 2026-27 FOR ALL TYPES OF LIGTHTING MAINTENANCE MATERIAL
THE FINANCIAL YEAR 2026-27 FOR ALL TYPES OF LIGHTING STREET LIGHT NEW MATERIAL
Inviting Rates for Pipe Line, Fitting Material , Pumps e.t.c. for Financial Year 2026-27 for Water Works Department, Municipal Corporation Sagar
CONSTRUCTION OF A CC ROAD IN THE LANE BEHIND SISODIA NURSING HOME, WARD NO. 05
CONST.OF C.C ROAD FROM H.NO.2 HAFEEZ BHAI HOUSE TO NAEEM BHAI HOUSE PNB COLONY IDGAH HILLS WARD NO.10 Z-02
CONSTRUCTION OF AN RCC RAMP IN THE LANE AT GYAN TEKRI, WARD NO. 02.
CONST.OF C.C ROAD AT DR. BHARTI HOUSE TO DR.SHAWAR HOUSE HOUSING BOARD KOH E FIZA WARD NO.7 Z-02
CONSTRUCTION OF CC ROAD AT WARD NO 28 MALVIYA JI TO TIWARI JI HOUSE MUNICIPAL COUNCIL NARMADAPURAM MP.
CONSTRUCTION OF RCC DRAIN AT WARD NO 28 POONAM MESHKAR TO SURENDRA PARMAR HOUSE MUNICIPAL COUNCIL NARMADAPURAM MP.
Selection of a Concessionaire for Design, Build, Finance, Operate, and Transfer (DBFOT) of a 400 TPD Municipal Solid Waste Processing Facility for Wet Waste-to-Compressed Biogas (CBG) Plant
Scientific disposal of daily fresh waste and unprocessed waste at the solid waste management plant located in Jamunjhiri at Chhindwara
Construction OF CC Road, RCC Drain, Paver Block Fixing AND Electrification Work AT Ward-01 Suraj Kol House To Siya Kol House Anuppur.
Supplying and Fixing of Trommel Screen With all necessary Equipment (Complete Machine) For Capacity Enhancement and operation of MRF/Composting Plant Under SBM (U) 2.0 In Nagar Parishad Betma (as per Specification)
Construction of RCC Drain from Lal Singh House to Saket Basti at Ward No.30
Construction Of Public Toilets And Urinals Under Swachh Bharat Mission (Urban 2.0)
Outdoor Catering - Food packets/catering etc. for programs, meetings and natural calamities organized from time to time.
Outdoor Refreshments Serving refreshments and similar duties during periodically organized events and meetings.
Construction of C.C. Road and Drain from Munna Chacha s house, passing through Farida Khan s location, up to the houses of Shikhawat Khan and Pappu Khan in Eidgah Mohalla under Ward Number 11. Indergarh
Construction of C.C. Road and Drains on both sides from Aasu Kushwaha s house to Raju Chandel s house in Ward Number 08. Indergarh
Construction of C.C. Road from Main Road to the school, adjacent to Patel Suraj Singh s house in Ward Number 15. Indergarh
Providing laying jointing and Commissioning of D.I Pipe line from Sanjeev Nagar to Bandikhedi for EMC 2.0, under WWD BMC
Construction of RCC Drain near jio office and pathak ji house ward no. 40
Estimate for CC work prathmik pathshala Dasauti at in ward no 26
Construction of tar road from ambedkar chowk railwayline and nai basti approach road ward no.41
Plantation of hedge and plants at ward no. 32 indra chowk to pankaj stationary
EMPANELLMENT OF AGENCIES FOR PROVIDING 15MM, 20MM, 25MM WATER TAP CONNECTION FOR HOUSEHOLDS AND 50MM, 80MM, 100MM, 150MM AND 200MM AND ABOVE SIZE WATER TAP BULK CONNECTIONS IN COLONIES
LIGHTING ARRANGMENT OF W.N.32 PAWAR MANGAL BHAWAN TO SAREKHA KOSMI BAYPASS AT BALAGHAT
LIGHTING ARRANGMENT OF W.N.22 UTKARSHT SCHOOL MAIDAN AT BALAGHAT
Construction of C.C. Road at police line surajkund ward.
Construction of CC Road work in ward no. 09 Gujari Bazar at Balaghat
(Moulik Nidhi) Construction work of C.C. Floor and Drain in Near Sanjivani Clinic Sikandar Kampoo Ward No.51.File No.410/26X3/6.
Construction work of Boundry wall at IHSDP Quarter. ward No. 55. File No. 169/26X3/3
Adhyaksha Nidhi Construction work of Interlocking paver block in Foothpath At Kampoo Quarter. ward No. 55. File No. 402/26X3/6.
SELECTION OF EPC TURNKEY CONTRACTOR FOR SITC OF 01 NO. 25/30 MVA ( ONAN/ONAF), 132/33 KV POWER TRANSFORMER WITH NIFPS, ASSOCIATED CIVIL WORKS, CONTROL and PROTECTION SYSTEM AND ALLIED WORKS AT BHAKLAI PHASE-III NARMADA WATER SUPPLY PROJECT SECOND CAL
OPERATION and MAINTENANCE Of 33KV/6.6KV sub stations and Five Stage Pumping of Capacity 180 MLD under Narmada Water Supply Phase-I and phase-II at Jalood, Mandleshwar Dist.-Khargone From Intake well to Break Pressure Tank, including qualified Second
CONSTRUCTION OF 32 NOS. SHOP ON FIRST FLOOR NEAR NEW BUS STAND NETAJI SUBHASHCHAND BOSE WARD KHURAI
Construction of CC road from indar house to pravin house at ward no 03 bagli
Construction of CC road near baldev house at ward no 03 bagli
Construction of CC road from anil house to nagar house at ward no 03 bagli
Const. Rcc Drain Ward No 34 Muncipal Area Chhatarpur
Rejuvanation Narsingh Temple Taliya Muncipal Area Chhatapur
Construction of Aaganwadi Centre No. 13 Building in Ward No. 06, Nagar Parishad, Lanji
Construction of Aaganwadi Centre No. 01 Building in Ward No. 05, Nagar Parishad, Lanji
Construction of Aaganwadi Centre No. 04 Building in Ward No. 07, Nagar Parishad, Lanji