Loading
Loading…
Loading…
53 results • Recent activity
Shifting HT and LT lines and poles from Kunithala Vayannoor Vellarvally road in favour of AE PMGSY under ES Thondiyil
Supply of Aerial Bunched Cable LT
shifting of HT LT lines and poles, Transformers from Puthiya puzhakara to Karanthad within 2m under deposit work. The work involves 11nos of A pole 11m for cut poles. Total line length HT LT 700m Shifting of line AB DP structure-1no. (Puthiyapuzhakar
1. Shifting of HT LT Line 0.950 KM 2. Shifting of LT Line only 0.510 KM 3.Shifting of Transformer DP Structure 2 Nos
Stringing of 1 kV Aerial bunched cable of size 3 x 70 sqmm with bare insulated Messenger through existing poles 2562 meter and allied works.