Loading…
Loading…
380 results • Recent activity
Erection of running earth on existing 33 kV, 6.6 kV and 3.3 kV overhead line at Bharatpur OCP
Making of 20 nos of cable joint box and 10 nos main switch stand for use of various pumping works and power supply purpose at different place of Bharatpur OCP
Lifting of breakdown Submersible Pump and Motor Set, 8 inch dia M.S Pipe (Column Pipe) and Flexible power cables including lowering of all items after repairing at Deulbera Pit Top and Handidhua Pit Top bore hole with respect of IWSS,Lingaraj Area as
Making of cross belt jointing cold patching and drum lagging by cold and hot joint in rubber nylon belt of 1200mm and 1400mm width belt conveyors at CHP and RLS of BOCP for Two years
Dismantling and Erection of Rollers, Brackets of all the conveyor of the plant for 365 days at New Silo, Bharatpur OCP as per the instruction of Engineer Incharge
Paper setting, Stitchning and binding with numbering of various departments of IB Valley Area.